Queens, NY: data center power outlook

Queens, New York is served through the NYISO market (New York Independent System Operator), and the figures below describe the public grid around a prospective data center site there. Queens carries 63 mapped substations within its boundary, and the highest reachable grid access is 348 kV. Service in Queens spans 3 utilities, with CONSOLIDATED EDISON CO-NY INC, LONG ISLAND POWER AUTHORITY, NORTH SHORE TOWERS APTS INC among those mapped.

Grid position at a glance

Serving utilities
CONSOLIDATED EDISON CO-NY INC, LONG ISLAND POWER AUTHORITY, NORTH SHORE TOWERS APTS INC
ISO / market
NYISO (New York Independent System Operator)
Highest grid access
348 kV
Substations in county
63
Industrial retail rate
9.6¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
Per-utility rates in county
1 of 3 serving utilities: 26.0¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
Interconnection queue
7 projects, 330 MW
Proposed generation
19 MW planned or under constructionUnits filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
Grid carbon intensity
479 lb CO2/MWh
Water withdrawals
0.2 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
Construction labor near site
452,037 employed in construction within ~120 km (30 of 31 counties reporting)A large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.

Grid conditions in Queens

The material below frames Queens, New York for a prospective large load, drawing only on public sources. Grid access in Queens extends to 348 kV, a high-voltage line class. The mapped layer packs 63 substations into Queens, a dense spread of options.

Interconnection over Queens runs through the NYISO market (New York Independent System Operator) and its rules. For Queens, the rate shown is the state industrial average of 9.6 cents per kWh (EIA-861), a state figure and not a county-specific one. Beneath that state average, the utilities serving Queens that report an industrial rate span 1 of 3 serving utilities: 26.0¢/kWh, shown as context and never as the county rate.

The queue feeds show 7 projects for Queens, totalling 330.2 MW of requested capacity. EIA-860M records 18.5 MW planned or under construction for Queens. Queens sits under a balancing authority that eGRID puts at 479.212 lb CO2 per MWh.

Queens withdrew 0.23 million gallons per day for all uses in the USGS 2015 data, which counts demand, not headroom. About 452,037 people are employed in construction within a 120 km commute of Queens (BLS QCEW), which frames staffing distance rather than free labour.

For Queens, treat this as screening-grade county context useful for narrowing a search rather than settling a site. Taken together, the figures for Queens, New York describe the grid around a prospective site, drawn from public data with their gaps left visible on purpose. To move past screening in Queens, New York, a specific address needs its own interconnection study, which this page does not attempt. The figures for Queens, New York refresh as their public datasets do, and the exact sources and dates sit in the source log below this section.