Otsego, NY: data center power outlook
The grid around Otsego, New York is summarized here from public data, starting from the county's position in the NYISO market (New York Independent System Operator). Inside Otsego the mapped layer shows 35 mapped substations, with grid access reaching 345 kV at its strongest point. Retail service across Otsego is split among 5 utilities, among them DELAWARE COUNTY ELEC COOP INC, NEW YORK STATE ELEC & GAS CORP, NIAGARA MOHAWK POWER CORP..
Grid position at a glance
- Serving utilities
- DELAWARE COUNTY ELEC COOP INC, NEW YORK STATE ELEC & GAS CORP, NIAGARA MOHAWK POWER CORP., ONEIDA-MADISON ELEC COOP, INC, OTSEGO ELECTRIC COOP, INC
- ISO / market
- NYISO (New York Independent System Operator)
- Highest grid access
- 345 kV
- Substations in county
- 35
- Industrial retail rate
- 9.6¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
- Per-utility rates in county
- 2 of 5 serving utilities: 2.5 to 2.7¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
- Interconnection queue
- None on record
- Proposed generation
- 71 MW planned or under constructionUnits filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
- Grid carbon intensity
- 479 lb CO2/MWh
- Water withdrawals
- 5.6 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
- Construction labor near site
- 47,612 employed in construction within ~120 kmA large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.
Grid conditions in Otsego
Read on for the public power picture of Otsego in New York, assembled for data center siting. At 345 kV, Otsego carries high-voltage transmission at its strongest mapped point. Otsego contains 35 mapped substations, a dense footprint that spreads interconnection options across many points.
Wholesale activity over Otsego clears through the NYISO market (New York Independent System Operator), whose footprint sets how interconnection requests and capacity are handled. Otsego carries the state industrial average retail rate of 9.6 cents per kWh from EIA-861, applied statewide. For Otsego, the per-utility spread is 2 of 5 serving utilities: 2.5 to 2.7¢/kWh, which qualifies but never replaces the state average.
Otsego, New York has nothing in the interconnection queue across the feeds covered here, quiet or uningested. In Otsego, 71.4 MW is filed as planned or under construction in the federal EIA-860M inventory. In eGRID, the balancing authority over Otsego shows 479.212 lb CO2 per MWh.
For Otsego, the USGS 2015 compilation records 5.58 million gallons per day of all-use freshwater withdrawals, not water available to a new load. Otsego sits within commuting range of roughly 47,612 construction workers (BLS QCEW, about 120 km), most already committed elsewhere.
Every figure for Otsego here is screening-grade and describes the county as a whole, not any single parcel within it. None of the figures for Otsego, New York settles a site on its own; each one qualifies the others, and all of them come from public federal and state datasets. Settling a site in Otsego, New York requires a study of the specific parcel, a step beyond the county-level picture drawn here. Sources and data dates for Otsego, New York are logged directly below, so each figure on this page can be traced back to its public dataset.