Power by county

Erie, NY: data center power outlook

Erie sits in the NYISO market (New York Independent System Operator); what follows is the screening-grade grid picture for Erie, New York, drawn from public datasets. Counting from the mapped infrastructure, Erie holds 198 mapped substations and reaches 345 kV. Erie is covered by 6 retail service territories, including NEW YORK STATE ELEC & GAS CORP, NIAGARA MOHAWK POWER CORP., STEUBEN RURAL ELEC COOP, INC.

Grid position at a glance

Serving utilities
NEW YORK STATE ELEC & GAS CORP, NIAGARA MOHAWK POWER CORP., STEUBEN RURAL ELEC COOP, INC, VILLAGE OF AKRON - (NY), VILLAGE OF ARCADE - (NY), VILLAGE OF SPRINGVILLE - (NY)
ISO / market
NYISO (New York Independent System Operator)
Highest grid access
345 kV
Substations in county
198
Industrial retail rate
9.6¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
Per-utility rates in county
2 of 6 serving utilities: 2.5 to 2.7¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
Interconnection queue
1 projects, 20 MW
Proposed generation
24 MW planned or under constructionUnits filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
Grid carbon intensity
479 lb CO2/MWh
Water withdrawals
341 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
Construction labor near site
50,671 employed in construction within ~120 kmA large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.

Grid conditions in Erie

Below, Erie in New York is described from public data as a starting point for siting diligence. Erie reaches 345 kV, a high-voltage transmission class, at its strongest mapped point of grid access. With 198 substations mapped, Erie offers interconnection points across many locations.

Erie falls inside the NYISO market (New York Independent System Operator), which governs how its interconnection requests and capacity move. The rate for Erie is the 9.6 cents per kWh state industrial average (EIA-861), the same figure the map colours by. Across Erie, reported per-utility industrial rates cover 2 of 6 serving utilities: 2.5 to 2.7¢/kWh, offered only as context beneath the state figure.

Erie has 1 interconnection-queue project on record, totalling 20 MW of requested capacity. Erie has 23.5 MW of planned or under-construction generation on file in EIA-860M. The balancing authority covering Erie carries a grid carbon intensity of 479.212 lb CO2 per MWh in eGRID.

Reported freshwater withdrawals for all uses in Erie are 340.75 million gallons per day in the USGS 2015 compilation, existing demand rather than water free for a new load. Around Erie, some 50,671 people work in construction within about a 120 km commute (BLS QCEW), a measure of reach, not of available crews.

These numbers for Erie are screening-grade context for the whole county, drawn from public data with the gaps left visible. Read the figures for Erie, New York together rather than one at a time: grid access matters less without substations near it, and a quiet queue reads differently inside an organized market than outside one. The next step for Erie, New York is an address-level interconnection study; the county figures here only narrow where to look. For Erie, New York, the source log below records where each figure comes from and when it was pulled, keeping the provenance visible.