Power by county

McKinley, NM: data center power outlook

McKinley, New Mexico is served through an area outside an organized wholesale market, and the figures below describe the public grid around a prospective data center site there. McKinley carries 22 mapped substations within its boundary, and the highest reachable grid access is 345 kV. Service in McKinley spans 4 utilities, with CITY OF GALLUP - (NM), CONTINENTAL DIVIDE EL COOP INC, NAVAJO TRIBAL UTILITY AUTHORITY among those mapped.

Grid position at a glance

Serving utilities
CITY OF GALLUP - (NM), CONTINENTAL DIVIDE EL COOP INC, NAVAJO TRIBAL UTILITY AUTHORITY, WAPA-- WESTERN AREA POWER ADMINISTRATION
ISO / market
NON_ISO (Not in an organized wholesale market)
Highest grid access
345 kV
Substations in county
22
Industrial retail rate
5.9¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
Per-utility rates in county
3 of 4 serving utilities: 2.6 to 23.8¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
Interconnection queue
None on record
Proposed generation
140 MW planned or under constructionUnits filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
Grid carbon intensity
394 lb CO2/MWh
Water withdrawals
11 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
Construction labor near site
5,130 employed in construction within ~120 kmA large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.

Grid conditions in McKinley

The material below frames McKinley, New Mexico for a prospective large load, drawing only on public sources. Grid access in McKinley extends to 345 kV, a high-voltage line class. The mapped layer packs 22 substations into McKinley, a dense spread of options.

Because McKinley, New Mexico sits outside an organized market, capacity and interconnection are handled by the utility and bilateral deals, not a market operator. For McKinley, the rate shown is the state industrial average of 5.9 cents per kWh (EIA-861), a state figure and not a county-specific one. Beneath that state average, the utilities serving McKinley that report an industrial rate span 3 of 4 serving utilities: 2.6 to 23.8¢/kWh, shown as context and never as the county rate.

Across the covered feeds, McKinley, New Mexico carries no interconnection-queue project, from either real quiet or a feed not yet loaded. EIA-860M records 140 MW planned or under construction for McKinley. McKinley sits under a balancing authority that eGRID puts at 394.248 lb CO2 per MWh.

McKinley withdrew 11.18 million gallons per day for all uses in the USGS 2015 data, which counts demand, not headroom. About 5,130 people are employed in construction within a 120 km commute of McKinley (BLS QCEW), which frames staffing distance rather than free labour.

For McKinley, treat this as screening-grade county context useful for narrowing a search rather than settling a site. Taken together, the figures for McKinley, New Mexico describe the grid around a prospective site, drawn from public data with their gaps left visible on purpose. To move past screening in McKinley, New Mexico, a specific address needs its own interconnection study, which this page does not attempt. The figures for McKinley, New Mexico refresh as their public datasets do, and the exact sources and dates sit in the source log below this section.

Sources