Power by county
Bergen, NJ: data center power outlook
Bergen, New Jersey is served through the PJM market (PJM Interconnection), and the figures below describe the public grid around a prospective data center site there. Bergen carries 30 mapped substations within its boundary, and the highest reachable grid access is 345 kV. Service in Bergen spans 6 utilities, with BOROUGH OF PARK RIDGE - (NJ), CONSOLIDATED EDISON CO-NY INC, JERSEY CENTRAL POWER & LT CO among those mapped.
Grid position at a glance
- Serving utilities
- BOROUGH OF PARK RIDGE - (NJ), CONSOLIDATED EDISON CO-NY INC, JERSEY CENTRAL POWER & LT CO, ORANGE & ROCKLAND UTILS INC, PUBLIC SERVICE ELEC & GAS CO, ROCKLAND ELECTRIC CO
- ISO / market
- PJM (PJM Interconnection)
- Highest grid access
- 345 kV
- Substations in county
- 30
- Industrial retail rate
- 13.9¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
- Per-utility rates in county
- 3 of 6 serving utilities: 4.0 to 11.7¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
- Interconnection queue
- None on record
- Proposed generation
- None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
- Grid carbon intensity
- 716 lb CO2/MWh
- Water withdrawals
- 134 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
- Construction labor near site
- 452,125 employed in construction within ~120 km (35 of 36 counties reporting)A large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.
Grid conditions in Bergen
What follows is a screening-grade read of Bergen, New Jersey, built only from named public datasets. Grid access in Bergen extends to 345 kV, a high-voltage line class. The mapped layer packs 30 substations into Bergen, a dense spread of options.
Interconnection over Bergen runs through the PJM market (PJM Interconnection) and its rules. For Bergen, the rate shown is the state industrial average of 13.9 cents per kWh (EIA-861), a state figure and not a county-specific one. Beneath that state average, the utilities serving Bergen that report an industrial rate span 3 of 6 serving utilities: 4.0 to 11.7¢/kWh, shown as context and never as the county rate.
No interconnection-queue project is on record for Bergen, New Jersey in the covered feeds, which reflects either genuine quiet or a queue not yet ingested. EIA-860M lists nothing planned or under construction for Bergen, New Jersey, which is a national filing and so a real zero. Bergen sits under a balancing authority that eGRID puts at 716.09 lb CO2 per MWh.
Bergen withdrew 133.95 million gallons per day for all uses in the USGS 2015 data, which counts demand, not headroom. About 452,125 people are employed in construction within a 120 km commute of Bergen (BLS QCEW), which frames staffing distance rather than free labour.
For Bergen, treat this as screening-grade county context useful for narrowing a search rather than settling a site. Taken together, the figures for Bergen, New Jersey describe the grid around a prospective site, drawn from public data with their gaps left visible on purpose. To move past screening in Bergen, New Jersey, a specific address needs its own interconnection study, which this page does not attempt. The figures for Bergen, New Jersey refresh as their public datasets do, and the exact sources and dates sit in the source log below this section.