Power by county

Atlantic, NJ: data center power outlook

Atlantic sits in the PJM market (PJM Interconnection); what follows is the screening-grade grid picture for Atlantic, New Jersey, drawn from public datasets. Counting from the mapped infrastructure, Atlantic holds 21 mapped substations and reaches 230 kV. Atlantic is covered by 2 retail service territories, including ATLANTIC CITY ELECTRIC CO, CITY OF VINELAND - (NJ).

Grid position at a glance

Serving utilities
ATLANTIC CITY ELECTRIC CO, CITY OF VINELAND - (NJ)
ISO / market
PJM (PJM Interconnection)
Highest grid access
230 kV
Substations in county
21
Industrial retail rate
13.9¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
Per-utility rates in county
2 serving utilities: 5.8 to 13.5¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
Interconnection queue
None on record
Proposed generation
2 MW planned or under constructionUnits filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
Grid carbon intensity
716 lb CO2/MWh
Water withdrawals
55 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
Construction labor near site
201,438 employed in construction within ~120 km (21 of 22 counties reporting)A large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.

Grid conditions in Atlantic

Below, Atlantic in New Jersey is described from public data as a starting point for siting diligence. Atlantic reaches 230 kV at its highest mapped voltage, a transmission class that can carry a substantial interconnection where capacity exists. With 21 substations mapped, Atlantic offers interconnection points across many locations.

Atlantic falls inside the PJM market (PJM Interconnection), which governs how its interconnection requests and capacity move. The rate for Atlantic is the 13.9 cents per kWh state industrial average (EIA-861), the same figure the map colours by. Across Atlantic, reported per-utility industrial rates cover 2 serving utilities: 5.8 to 13.5¢/kWh, offered only as context beneath the state figure.

The covered queue feeds list nothing for Atlantic, New Jersey, which may be quiet or simply uningested. Atlantic has 2.3 MW of planned or under-construction generation on file in EIA-860M. The balancing authority covering Atlantic carries a grid carbon intensity of 716.09 lb CO2 per MWh in eGRID.

Reported freshwater withdrawals for all uses in Atlantic are 54.62 million gallons per day in the USGS 2015 compilation, existing demand rather than water free for a new load. Around Atlantic, some 201,438 people work in construction within about a 120 km commute (BLS QCEW), a measure of reach, not of available crews.

These numbers for Atlantic are screening-grade context for the whole county, drawn from public data with the gaps left visible. Read the figures for Atlantic, New Jersey together rather than one at a time: grid access matters less without substations near it, and a quiet queue reads differently inside an organized market than outside one. The next step for Atlantic, New Jersey is an address-level interconnection study; the county figures here only narrow where to look. For Atlantic, New Jersey, the source log below records where each figure comes from and when it was pulled, keeping the provenance visible.

Sources