Elko, NV: data center power outlook

Elko sits in an area outside an organized wholesale market; what follows is the screening-grade grid picture for Elko, Nevada, drawn from public datasets. Counting from the mapped infrastructure, Elko holds 17 mapped substations and reaches 360 kV. Elko is covered by 6 retail service territories, including IDAHO POWER CO, MT WHEELER POWER, INC, PACIFICORP.

Grid position at a glance

Serving utilities
IDAHO POWER CO, MT WHEELER POWER, INC, PACIFICORP, RAFT RURAL ELEC COOP INC, SIERRA PACIFIC POWER CO, WELLS RURAL ELECTRIC CO
ISO / market
NON_ISO (Not in an organized wholesale market)
Highest grid access
360 kV
Substations in county
17
Industrial retail rate
8.1¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
Per-utility rates in county
4 of 6 serving utilities: 4.9 to 7.0¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
Interconnection queue
None on record
Proposed generation
None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
Grid carbon intensity
705 lb CO2/MWh
Water withdrawals
396 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
Construction labor near site
1,642 employed in construction within ~120 kmA large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.

Grid conditions in Elko

Everything here about Elko, Nevada comes from public federal and state records, with the gaps left visible. Elko reaches 360 kV, a high-voltage transmission class, at its strongest mapped point of grid access. With 17 substations mapped, Elko has a moderate spread of interconnection points.

Elko, Nevada is not inside an organized market, which leaves interconnection to the utility and bilateral contracts. The rate for Elko is the 8.1 cents per kWh state industrial average (EIA-861), the same figure the map colours by. Across Elko, reported per-utility industrial rates cover 4 of 6 serving utilities: 4.9 to 7.0¢/kWh, offered only as context beneath the state figure.

The covered queue feeds list nothing for Elko, Nevada, which may be quiet or simply uningested. Nothing is on file for Elko, Nevada in EIA-860M as planned or under construction, which counts as a measured zero. The balancing authority covering Elko carries a grid carbon intensity of 704.866 lb CO2 per MWh in eGRID.

Reported freshwater withdrawals for all uses in Elko are 396.03 million gallons per day in the USGS 2015 compilation, existing demand rather than water free for a new load. Around Elko, some 1,642 people work in construction within about a 120 km commute (BLS QCEW), a measure of reach, not of available crews.

These numbers for Elko are screening-grade context for the whole county, drawn from public data with the gaps left visible. Read the figures for Elko, Nevada together rather than one at a time: grid access matters less without substations near it, and a quiet queue reads differently inside an organized market than outside one. The next step for Elko, Nevada is an address-level interconnection study; the county figures here only narrow where to look. For Elko, Nevada, the source log below records where each figure comes from and when it was pulled, keeping the provenance visible.