Grant, NE: data center power outlook
Grant, Nebraska is served through an area outside an organized wholesale market, and the figures below describe the public grid around a prospective data center site there. Grant carries 1 mapped substation within its boundary, and the highest reachable grid access is 115 kV. Service in Grant spans 3 utilities, with CUSTER PUBLIC POWER DISTRICT, LACREEK ELECTRIC ASSN, INC, PANHANDLE RURAL EL MEMBER ASSN among those mapped.
Grid position at a glance
- Serving utilities
- CUSTER PUBLIC POWER DISTRICT, LACREEK ELECTRIC ASSN, INC, PANHANDLE RURAL EL MEMBER ASSN
- ISO / market
- NON_ISO (Not in an organized wholesale market)
- Highest grid access
- 115 kV
- Substations in county
- 1
- Industrial retail rate
- 8.0¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
- Per-utility rates in county
- 1 of 3 serving utilities: 13.0¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
- Interconnection queue
- None on record
- Proposed generation
- None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
- Grid carbon intensity
- 872 lb CO2/MWh
- Water withdrawals
- 1.8 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
- Construction labor near site
- 548 employed in construction within ~120 km (8 of 12 counties reporting)A large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.
Grid conditions in Grant
What follows is a screening-grade read of Grant, Nebraska, built only from named public datasets. At 115 kV, Grant sits in the transmission class that a large load would look to. Grant, Nebraska carries a thin 1-substation footprint in the mapped layer, concentrating where a connection could land.
Grant, Nebraska is not inside an organized market, which leaves interconnection to the utility and bilateral contracts. For Grant, the rate shown is the state industrial average of 8.0 cents per kWh (EIA-861), a state figure and not a county-specific one. Beneath that state average, the utilities serving Grant that report an industrial rate span 1 of 3 serving utilities: 13.0¢/kWh, shown as context and never as the county rate.
Across the covered feeds, Grant, Nebraska carries no interconnection-queue project, from either real quiet or a feed not yet loaded. Grant, Nebraska has no EIA-860M generation on file, which reads as zero rather than as a gap. Grant sits under a balancing authority that eGRID puts at 871.526 lb CO2 per MWh.
Grant withdrew 1.79 million gallons per day for all uses in the USGS 2015 data, which counts demand, not headroom. About 548 people are employed in construction within a 120 km commute of Grant (BLS QCEW), which frames staffing distance rather than free labour.
For Grant, treat this as screening-grade county context useful for narrowing a search rather than settling a site. Taken together, the figures for Grant, Nebraska describe the grid around a prospective site, drawn from public data with their gaps left visible on purpose. To move past screening in Grant, Nebraska, a specific address needs its own interconnection study, which this page does not attempt. The figures for Grant, Nebraska refresh as their public datasets do, and the exact sources and dates sit in the source log below this section.