Power by county

Cuming, NE: data center power outlook

Cuming, Nebraska is served through the SPP market (Southwest Power Pool), and the figures below describe the public grid around a prospective data center site there. Cuming carries 30 mapped substations within its boundary, and the highest reachable grid access is 115 kV. Service in Cuming spans 9 utilities, with BURT COUNTY PUBLIC POWER DIST, CITY OF WEST POINT - (NE), CITY OF WISNER among those mapped.

Grid position at a glance

Serving utilities
BURT COUNTY PUBLIC POWER DIST, CITY OF WEST POINT - (NE), CITY OF WISNER, CORNHUSKER PUBLIC POWER DIST, CUMING COUNTY PUBLIC PWR DIST, LOUP RIVER PUBLIC POWER DIST, NORTHEAST POWER, OMAHA PUBLIC POWER DISTRICT, STANTON COUNTY PUBLIC PWR DIST
ISO / market
SPP (Southwest Power Pool)
Highest grid access
115 kV
Substations in county
30
Industrial retail rate
8.0¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
Per-utility rates in county
4 of 9 serving utilities: 6.5 to 17.7¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
Interconnection queue
None on record
Proposed generation
2 MW planned or under constructionUnits filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
Grid carbon intensity
872 lb CO2/MWh
Water withdrawals
33 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
Construction labor near site
41,040 employed in construction within ~120 km (28 of 31 counties reporting)A large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.

Grid conditions in Cuming

What follows is a screening-grade read of Cuming, Nebraska, built only from named public datasets. At 115 kV, Cuming sits in the transmission class that a large load would look to. The mapped layer packs 30 substations into Cuming, a dense spread of options.

Interconnection over Cuming runs through the SPP market (Southwest Power Pool) and its rules. For Cuming, the rate shown is the state industrial average of 8.0 cents per kWh (EIA-861), a state figure and not a county-specific one. Beneath that state average, the utilities serving Cuming that report an industrial rate span 4 of 9 serving utilities: 6.5 to 17.7¢/kWh, shown as context and never as the county rate.

The covered queue feeds list nothing for Cuming, Nebraska, which may be quiet or simply uningested. EIA-860M records 1.5 MW planned or under construction for Cuming. Cuming sits under a balancing authority that eGRID puts at 871.526 lb CO2 per MWh.

Cuming withdrew 32.52 million gallons per day for all uses in the USGS 2015 data, which counts demand, not headroom. About 41,040 people are employed in construction within a 120 km commute of Cuming (BLS QCEW), which frames staffing distance rather than free labour.

For Cuming, treat this as screening-grade county context useful for narrowing a search rather than settling a site. Taken together, the figures for Cuming, Nebraska describe the grid around a prospective site, drawn from public data with their gaps left visible on purpose. To move past screening in Cuming, Nebraska, a specific address needs its own interconnection study, which this page does not attempt. The figures for Cuming, Nebraska refresh as their public datasets do, and the exact sources and dates sit in the source log below this section.

Sources