The grid around Burt, Nebraska is summarized here from public data, starting from the county's position in the SPP market (Southwest Power Pool). Inside Burt the mapped layer shows 2 mapped substations, with grid access reaching 345 kV at its strongest point. Retail service across Burt is split among 11 utilities, among them BURT COUNTY PUBLIC POWER DIST, CITY OF LYONS - (NE), CUMING COUNTY PUBLIC PWR DIST.
Grid position at a glance
- Serving utilities
- BURT COUNTY PUBLIC POWER DIST, CITY OF LYONS - (NE), CUMING COUNTY PUBLIC PWR DIST, HARRISON COUNTY RRL ELEC COOP, MIDAMERICAN ENERGY CO, NEBRASKA PUBLIC POWER DISTRICT, NORTHEAST POWER, OMAHA PUBLIC POWER DISTRICT, VILLAGE OF DECATUR - (NE), WAPA-- WESTERN AREA POWER ADMINISTRATION, WESTERN IOWA POWER COOP
- ISO / market
- SPP (Southwest Power Pool)
- Highest grid access
- 345 kV
- Substations in county
- 2
- Industrial retail rate
- 8.0¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
- Per-utility rates in county
- 3 of 11 serving utilities: 4.5 to 17.7¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
- Interconnection queue
- None on record
- Proposed generation
- 75 MW planned or under constructionUnits filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
- Grid carbon intensity
- 872 lb CO2/MWh
- Water withdrawals
- 29 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
- Construction labor near site
- 43,743 employed in construction within ~120 km (28 of 31 counties reporting)A large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.
Grid conditions in Burt
The sections below set out what public data shows about siting a large electrical load in Burt, Nebraska. At 345 kV, Burt carries high-voltage transmission at its strongest mapped point. Across Burt, Nebraska, the mapped layer holds just 2 substations, so options gather at a handful of places.
Wholesale activity over Burt clears through the SPP market (Southwest Power Pool), whose footprint sets how interconnection requests and capacity are handled. Burt carries the state industrial average retail rate of 8.0 cents per kWh from EIA-861, applied statewide. For Burt, the per-utility spread is 3 of 11 serving utilities: 4.5 to 17.7¢/kWh, which qualifies but never replaces the state average.
For Burt, Nebraska, no queued project appears in the feeds currently covered. In Burt, 75 MW is filed as planned or under construction in the federal EIA-860M inventory. In eGRID, the balancing authority over Burt shows 871.526 lb CO2 per MWh.
For Burt, the USGS 2015 compilation records 28.72 million gallons per day of all-use freshwater withdrawals, not water available to a new load. Burt sits within commuting range of roughly 43,743 construction workers (BLS QCEW, about 120 km), most already committed elsewhere.
Every figure for Burt here is screening-grade and describes the county as a whole, not any single parcel within it. None of the figures for Burt, Nebraska settles a site on its own; each one qualifies the others, and all of them come from public federal and state datasets. Settling a site in Burt, Nebraska requires a study of the specific parcel, a step beyond the county-level picture drawn here. Sources and data dates for Burt, Nebraska are logged directly below, so each figure on this page can be traced back to its public dataset.