Power by county

Brown, NE: data center power outlook

Brown, Nebraska is served through the SPP market (Southwest Power Pool), and the figures below describe the public grid around a prospective data center site there. Brown carries 7 mapped substations within its boundary, and the highest reachable grid access is 115 kV. Service in Brown spans 5 utilities, with CHERRY-TODD ELECTRIC COOP, INC, CUSTER PUBLIC POWER DISTRICT, KBR RURAL PUBLIC POWER DISTRICT among those mapped.

Grid position at a glance

Serving utilities
CHERRY-TODD ELECTRIC COOP, INC, CUSTER PUBLIC POWER DISTRICT, KBR RURAL PUBLIC POWER DISTRICT, LACREEK ELECTRIC ASSN, INC, NEBRASKA PUBLIC POWER DISTRICT
ISO / market
SPP (Southwest Power Pool)
Highest grid access
115 kV
Substations in county
7
Industrial retail rate
8.0¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
Per-utility rates in county
2 of 5 serving utilities: 4.5 to 13.0¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
Interconnection queue
None on record
Proposed generation
None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
Grid carbon intensity
872 lb CO2/MWh
Water withdrawals
70 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
Construction labor near site
575 employed in construction within ~120 km (8 of 15 counties reporting)A large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.

Grid conditions in Brown

What follows is a screening-grade read of Brown, Nebraska, built only from named public datasets. At 115 kV, Brown sits in the transmission class that a large load would look to. The mapped layer places 7 substations across Brown, a moderate density.

Interconnection over Brown runs through the SPP market (Southwest Power Pool) and its rules. For Brown, the rate shown is the state industrial average of 8.0 cents per kWh (EIA-861), a state figure and not a county-specific one. Beneath that state average, the utilities serving Brown that report an industrial rate span 2 of 5 serving utilities: 4.5 to 13.0¢/kWh, shown as context and never as the county rate.

Across the covered feeds, Brown, Nebraska carries no interconnection-queue project, from either real quiet or a feed not yet loaded. Nothing is on file for Brown, Nebraska in EIA-860M as planned or under construction, which counts as a measured zero. Brown sits under a balancing authority that eGRID puts at 871.526 lb CO2 per MWh.

Brown withdrew 70.1 million gallons per day for all uses in the USGS 2015 data, which counts demand, not headroom. About 575 people are employed in construction within a 120 km commute of Brown (BLS QCEW), which frames staffing distance rather than free labour.

For Brown, treat this as screening-grade county context useful for narrowing a search rather than settling a site. Taken together, the figures for Brown, Nebraska describe the grid around a prospective site, drawn from public data with their gaps left visible on purpose. To move past screening in Brown, Nebraska, a specific address needs its own interconnection study, which this page does not attempt. The figures for Brown, Nebraska refresh as their public datasets do, and the exact sources and dates sit in the source log below this section.

Sources