The grid around Platte, Missouri is summarized here from public data, starting from the county's position in the SPP market (Southwest Power Pool). Inside Platte the mapped layer shows 20 mapped substations, with grid access reaching 345 kV at its strongest point. Retail service across Platte is split among 6 utilities, among them CITY OF KANSAS CITY - (KS), EVERGY KANSAS CENTRAL, INC, EVERGY MISSOURI WEST.
Grid position at a glance
- Serving utilities
- CITY OF KANSAS CITY - (KS), EVERGY KANSAS CENTRAL, INC, EVERGY MISSOURI WEST, FREESTATE ELECTRIC COOP, PLATTE-CLAY ELECTRIC COOP, INC, UNION ELECTRIC CO - (MO)
- ISO / market
- SPP (Southwest Power Pool)
- Highest grid access
- 345 kV
- Substations in county
- 20
- Industrial retail rate
- 8.4¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
- Per-utility rates in county
- 3 of 6 serving utilities: 6.9 to 13.4¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
- Interconnection queue
- None on record
- Proposed generation
- None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
- Grid carbon intensity
- 872 lb CO2/MWh
- Water withdrawals
- 302 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
- Construction labor near site
- 74,265 employed in construction within ~120 kmA large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.
Grid conditions in Platte
Read on for the public power picture of Platte in Missouri, assembled for data center siting. At 345 kV, Platte carries high-voltage transmission at its strongest mapped point. Platte contains 20 mapped substations, a moderate footprint spread across the service area.
Wholesale activity over Platte clears through the SPP market (Southwest Power Pool), whose footprint sets how interconnection requests and capacity are handled. Platte carries the state industrial average retail rate of 8.4 cents per kWh from EIA-861, applied statewide. For Platte, the per-utility spread is 3 of 6 serving utilities: 6.9 to 13.4¢/kWh, which qualifies but never replaces the state average.
For Platte, Missouri, no queued project appears in the feeds currently covered. For Platte, Missouri, the EIA-860M inventory shows no planned or under-construction generation, a measured absence. In eGRID, the balancing authority over Platte shows 871.526 lb CO2 per MWh.
For Platte, the USGS 2015 compilation records 302.44 million gallons per day of all-use freshwater withdrawals, not water available to a new load. Platte sits within commuting range of roughly 74,265 construction workers (BLS QCEW, about 120 km), most already committed elsewhere.
Every figure for Platte here is screening-grade and describes the county as a whole, not any single parcel within it. None of the figures for Platte, Missouri settles a site on its own; each one qualifies the others, and all of them come from public federal and state datasets. Settling a site in Platte, Missouri requires a study of the specific parcel, a step beyond the county-level picture drawn here. Sources and data dates for Platte, Missouri are logged directly below, so each figure on this page can be traced back to its public dataset.