Power by county

Osage, MO: data center power outlook

Osage sits in the MISO market (Midcontinent Independent System Operator); what follows is the screening-grade grid picture for Osage, Missouri, drawn from public datasets. Counting from the mapped infrastructure, Osage holds 15 mapped substations and reaches 345 kV. Osage is covered by 3 retail service territories, including CALLAWAY ELECTRIC COOPERATIVE, THREE RIVERS ELECTRIC COOP, UNION ELECTRIC CO - (MO).

Grid position at a glance

Serving utilities
CALLAWAY ELECTRIC COOPERATIVE, THREE RIVERS ELECTRIC COOP, UNION ELECTRIC CO - (MO)
ISO / market
MISO (Midcontinent Independent System Operator)
Highest grid access
345 kV
Substations in county
15
Industrial retail rate
8.4¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
Per-utility rates in county
2 of 3 serving utilities: 7.6 to 9.7¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
Interconnection queue
1 projects, 100 MW
Proposed generation
None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
Grid carbon intensity
982 lb CO2/MWh
Water withdrawals
4.7 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
Construction labor near site
69,163 employed in construction within ~120 km (29 of 30 counties reporting)A large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.

Grid conditions in Osage

Everything here about Osage, Missouri comes from public federal and state records, with the gaps left visible. Osage reaches 345 kV, a high-voltage transmission class, at its strongest mapped point of grid access. With 15 substations mapped, Osage has a moderate spread of interconnection points.

Osage falls inside the MISO market (Midcontinent Independent System Operator), which governs how its interconnection requests and capacity move. The rate for Osage is the 8.4 cents per kWh state industrial average (EIA-861), the same figure the map colours by. Across Osage, reported per-utility industrial rates cover 2 of 3 serving utilities: 7.6 to 9.7¢/kWh, offered only as context beneath the state figure.

Osage has 1 interconnection-queue project on record, totalling 100 MW of requested capacity. Nothing is on file for Osage, Missouri in EIA-860M as planned or under construction, which counts as a measured zero. The balancing authority covering Osage carries a grid carbon intensity of 981.982 lb CO2 per MWh in eGRID.

Reported freshwater withdrawals for all uses in Osage are 4.71 million gallons per day in the USGS 2015 compilation, existing demand rather than water free for a new load. Around Osage, some 69,163 people work in construction within about a 120 km commute (BLS QCEW), a measure of reach, not of available crews.

These numbers for Osage are screening-grade context for the whole county, drawn from public data with the gaps left visible. Read the figures for Osage, Missouri together rather than one at a time: grid access matters less without substations near it, and a quiet queue reads differently inside an organized market than outside one. The next step for Osage, Missouri is an address-level interconnection study; the county figures here only narrow where to look. For Osage, Missouri, the source log below records where each figure comes from and when it was pulled, keeping the provenance visible.

Sources