Power by county

Douglas, MO: data center power outlook

Douglas, Missouri is served through an area outside an organized wholesale market, and the figures below describe the public grid around a prospective data center site there. Douglas carries 6 mapped substations within its boundary, and the highest reachable grid access is 161 kV. Service in Douglas spans 6 utilities, with CITY OF AVA - (MO), HOWELL-OREGON ELEC COOP, INC, INTERCOUNTY ELECTRIC COOP ASSN among those mapped.

Grid position at a glance

Serving utilities
CITY OF AVA - (MO), HOWELL-OREGON ELEC COOP, INC, INTERCOUNTY ELECTRIC COOP ASSN, SE-MA-NO ELECTRIC COOP, WEBSTER ELECTRIC COOP, WHITE RIVER VALLEY EL COOP INC
ISO / market
NON_ISO (Not in an organized wholesale market)
Highest grid access
161 kV
Substations in county
6
Industrial retail rate
8.4¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
Per-utility rates in county
3 of 6 serving utilities: 6.9 to 9.5¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
Interconnection queue
None on record
Proposed generation
None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
Grid carbon intensity
1,285 lb CO2/MWh
Water withdrawals
55 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
Construction labor near site
15,281 employed in construction within ~120 km (19 of 25 counties reporting)A large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.

Grid conditions in Douglas

What follows is a screening-grade read of Douglas, Missouri, built only from named public datasets. At 161 kV, Douglas sits in the transmission class that a large load would look to. The mapped layer places 6 substations across Douglas, a moderate density.

Douglas, Missouri is not inside an organized market, which leaves interconnection to the utility and bilateral contracts. For Douglas, the rate shown is the state industrial average of 8.4 cents per kWh (EIA-861), a state figure and not a county-specific one. Beneath that state average, the utilities serving Douglas that report an industrial rate span 3 of 6 serving utilities: 6.9 to 9.5¢/kWh, shown as context and never as the county rate.

Across the covered feeds, Douglas, Missouri carries no interconnection-queue project, from either real quiet or a feed not yet loaded. EIA-860M lists nothing planned or under construction for Douglas, Missouri, which is a national filing and so a real zero. Douglas sits under a balancing authority that eGRID puts at 1,285.192 lb CO2 per MWh.

Douglas withdrew 55.1 million gallons per day for all uses in the USGS 2015 data, which counts demand, not headroom. About 15,281 people are employed in construction within a 120 km commute of Douglas (BLS QCEW), which frames staffing distance rather than free labour.

For Douglas, treat this as screening-grade county context useful for narrowing a search rather than settling a site. Taken together, the figures for Douglas, Missouri describe the grid around a prospective site, drawn from public data with their gaps left visible on purpose. To move past screening in Douglas, Missouri, a specific address needs its own interconnection study, which this page does not attempt. The figures for Douglas, Missouri refresh as their public datasets do, and the exact sources and dates sit in the source log below this section.

Sources