Power by county
Dallas, MO: data center power outlook
The grid around Dallas, Missouri is summarized here from public data, starting from the county's position in an area outside an organized wholesale market. Inside Dallas the mapped layer shows 5 mapped substations, with grid access reaching 345 kV at its strongest point. Retail service across Dallas is split among 3 utilities, among them LACLEDE ELECTRIC COOP, INC, SOUTHWEST ELECTRIC COOP, INC, WEBSTER ELECTRIC COOP.
Grid position at a glance
- Serving utilities
- LACLEDE ELECTRIC COOP, INC, SOUTHWEST ELECTRIC COOP, INC, WEBSTER ELECTRIC COOP
- ISO / market
- NON_ISO (Not in an organized wholesale market)
- Highest grid access
- 345 kV
- Substations in county
- 5
- Industrial retail rate
- 8.4¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
- Per-utility rates in county
- 1 of 3 serving utilities: 10.2¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
- Interconnection queue
- None on record
- Proposed generation
- None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
- Grid carbon intensity
- 1,285 lb CO2/MWh
- Water withdrawals
- 2.3 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
- Construction labor near site
- 22,306 employed in construction within ~120 km (27 of 28 counties reporting)A large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.
Grid conditions in Dallas
The sections below set out what public data shows about siting a large electrical load in Dallas, Missouri. At 345 kV, Dallas carries high-voltage transmission at its strongest mapped point. Dallas, Missouri contains 5 mapped substations, a sparse footprint that concentrates interconnection options at a few points.
No organized wholesale market covers Dallas, Missouri, so capacity moves through the local utility and bilateral agreements. Dallas carries the state industrial average retail rate of 8.4 cents per kWh from EIA-861, applied statewide. For Dallas, the per-utility spread is 1 of 3 serving utilities: 10.2¢/kWh, which qualifies but never replaces the state average.
For Dallas, Missouri, no queued project appears in the feeds currently covered. For Dallas, Missouri, the EIA-860M inventory shows no planned or under-construction generation, a measured absence. In eGRID, the balancing authority over Dallas shows 1,285.192 lb CO2 per MWh.
For Dallas, the USGS 2015 compilation records 2.34 million gallons per day of all-use freshwater withdrawals, not water available to a new load. Dallas sits within commuting range of roughly 22,306 construction workers (BLS QCEW, about 120 km), most already committed elsewhere.
Every figure for Dallas here is screening-grade and describes the county as a whole, not any single parcel within it. None of the figures for Dallas, Missouri settles a site on its own; each one qualifies the others, and all of them come from public federal and state datasets. Settling a site in Dallas, Missouri requires a study of the specific parcel, a step beyond the county-level picture drawn here. Sources and data dates for Dallas, Missouri are logged directly below, so each figure on this page can be traced back to its public dataset.