Power by county
Boone, MO: data center power outlook
The grid around Boone, Missouri is summarized here from public data, starting from the county's position in the MISO market (Midcontinent Independent System Operator). Inside Boone the mapped layer shows 25 mapped substations, with grid access reaching 345 kV at its strongest point. Retail service across Boone is split among 10 utilities, among them BOONE ELECTRIC COOP, CALLAWAY ELECTRIC COOPERATIVE, CITY OF CENTRALIA - (MO).
Grid position at a glance
- Serving utilities
- BOONE ELECTRIC COOP, CALLAWAY ELECTRIC COOPERATIVE, CITY OF CENTRALIA - (MO), CITY OF COLUMBIA - (MO), CO-MO ELECTRIC COOP INC, CONSOLIDATED ELECTRIC COOP, HOWARD ELECTRIC COOP, MACON ELECTRIC COOP, THREE RIVERS ELECTRIC COOP, UNION ELECTRIC CO - (MO)
- ISO / market
- MISO (Midcontinent Independent System Operator)
- Highest grid access
- 345 kV
- Substations in county
- 25
- Industrial retail rate
- 8.4¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
- Per-utility rates in county
- 7 of 10 serving utilities: 7.2 to 10.1¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
- Interconnection queue
- 3 projects, 314 MW
- Proposed generation
- 9 MW planned or under constructionUnits filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
- Grid carbon intensity
- 982 lb CO2/MWh
- Water withdrawals
- 25 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
- Construction labor near site
- 17,589 employed in construction within ~120 km (27 of 28 counties reporting)A large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.
Grid conditions in Boone
Read on for the public power picture of Boone in Missouri, assembled for data center siting. At 345 kV, Boone carries high-voltage transmission at its strongest mapped point. Boone contains 25 mapped substations, a dense footprint that spreads interconnection options across many points.
Wholesale activity over Boone clears through the MISO market (Midcontinent Independent System Operator), whose footprint sets how interconnection requests and capacity are handled. Boone carries the state industrial average retail rate of 8.4 cents per kWh from EIA-861, applied statewide. For Boone, the per-utility spread is 7 of 10 serving utilities: 7.2 to 10.1¢/kWh, which qualifies but never replaces the state average.
Boone carries 3 projects in the interconnection queue, totalling 314 MW of requested capacity. In Boone, 9 MW is filed as planned or under construction in the federal EIA-860M inventory. In eGRID, the balancing authority over Boone shows 981.982 lb CO2 per MWh.
For Boone, the USGS 2015 compilation records 24.7 million gallons per day of all-use freshwater withdrawals, not water available to a new load. Boone sits within commuting range of roughly 17,589 construction workers (BLS QCEW, about 120 km), most already committed elsewhere.
Every figure for Boone here is screening-grade and describes the county as a whole, not any single parcel within it. None of the figures for Boone, Missouri settles a site on its own; each one qualifies the others, and all of them come from public federal and state datasets. Settling a site in Boone, Missouri requires a study of the specific parcel, a step beyond the county-level picture drawn here. Sources and data dates for Boone, Missouri are logged directly below, so each figure on this page can be traced back to its public dataset.