Power by county

Tate, MS: data center power outlook

For Tate, Mississippi, the public grid picture begins with its place in the MISO market (Midcontinent Independent System Operator) and the infrastructure mapped inside the county. Grid access across Tate tops out at 161 kV, over a footprint of 4 mapped substations. In Tate, 5 utilities share the retail territory, among them CITY OF NEW ALBANY - (MS), COAHOMA ELECTRIC POWER ASSN, ENTERGY MISSISSIPPI LLC.

Grid position at a glance

Serving utilities
CITY OF NEW ALBANY - (MS), COAHOMA ELECTRIC POWER ASSN, ENTERGY MISSISSIPPI LLC, NORTHCENTRAL MISSISSIPPI E P A, TALLAHATCHIE VALLEY E P A
ISO / market
MISO (Midcontinent Independent System Operator)
Highest grid access
161 kV
Substations in county
4
Industrial retail rate
7.4¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
Per-utility rates in county
4 of 5 serving utilities: 6.3 to 8.9¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
Interconnection queue
None on record
Proposed generation
5 MW planned or under constructionUnits filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
Grid carbon intensity
641 lb CO2/MWh
Water withdrawals
9.3 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
Construction labor near site
29,359 employed in construction within ~120 km (24 of 28 counties reporting)A large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.

Grid conditions in Tate

For Tate, Mississippi, the following sections turn public grid records into a siting-oriented summary. The strongest mapped access in Tate is 161 kV, squarely transmission class. Across Tate, Mississippi, the mapped layer holds just 4 substations, so options gather at a handful of places.

For Tate, the MISO market (Midcontinent Independent System Operator) is the operator that handles interconnection and capacity. The state industrial average retail rate is 7.4 cents per kWh, drawn from EIA-861 and applied to Tate at the state level rather than as a county rate. The serving utilities in Tate that publish a rate range 4 of 5 serving utilities: 6.3 to 8.9¢/kWh, a spread kept separate from the state average.

For Tate, Mississippi, no queued project appears in the feeds currently covered. Federal filings (EIA-860M) list 5 MW of generation as planned or under construction in Tate. Grid carbon intensity for Tate, via its balancing authority, is 641.018 lb CO2 per MWh in eGRID.

USGS 2015 puts freshwater withdrawals across Tate at 9.25 million gallons per day for all uses, a measure of use, not spare supply. Within roughly a 120 km commute of Tate, about 29,359 people are employed in construction (BLS QCEW), which speaks to how far crews for a multi-year build would travel, not to labour known to be free.

Read the Tate figures as screening-grade context: they describe the surrounding grid, not a specific parcel. The numbers for Tate, Mississippi qualify one another, so grid access, substation density, market membership, and rate are meant to be read as a set, not in isolation. Past this screening view, siting in Tate, Mississippi turns on a study of a particular address, something no county-level page can stand in for. Every number shown for Tate, Mississippi traces to a public source listed below, with its retrieval date, so the provenance is auditable rather than asserted.

Sources