Power by county
Sunflower, MS: data center power outlook
For Sunflower, Mississippi, the public grid picture begins with its place in the MISO market (Midcontinent Independent System Operator) and the infrastructure mapped inside the county. Grid access across Sunflower tops out at 230 kV, over a footprint of 14 mapped substations. In Sunflower, 5 utilities share the retail territory, among them CITY OF ITTA BENA - (MS), DELTA ELECTRIC POWER ASSN, ENTERGY MISSISSIPPI LLC.
Grid position at a glance
- Serving utilities
- CITY OF ITTA BENA - (MS), DELTA ELECTRIC POWER ASSN, ENTERGY MISSISSIPPI LLC, TWIN COUNTY ELECTRIC PWR ASSN, YAZOO VALLEY ELEC POWER ASSN
- ISO / market
- MISO (Midcontinent Independent System Operator)
- Highest grid access
- 230 kV
- Substations in county
- 14
- Industrial retail rate
- 7.4¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
- Per-utility rates in county
- 3 of 5 serving utilities: 6.9 to 13.8¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
- Interconnection queue
- 23 projects, 3,204 MW
- Proposed generation
- 100 MW planned or under constructionUnits filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
- Grid carbon intensity
- 982 lb CO2/MWh
- Water withdrawals
- 284 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
- Construction labor near site
- 4,176 employed in construction within ~120 km (24 of 28 counties reporting)A large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.
Grid conditions in Sunflower
This page gathers the public grid evidence for Sunflower, Mississippi that bears on a large new load. The strongest mapped access in Sunflower is 230 kV, squarely transmission class. Sunflower carries 14 substations in the mapped layer, spread across the county.
For Sunflower, the MISO market (Midcontinent Independent System Operator) is the operator that handles interconnection and capacity. The state industrial average retail rate is 7.4 cents per kWh, drawn from EIA-861 and applied to Sunflower at the state level rather than as a county rate. The serving utilities in Sunflower that publish a rate range 3 of 5 serving utilities: 6.9 to 13.8¢/kWh, a spread kept separate from the state average.
On record for Sunflower are 23 interconnection-queue projects, totalling 3,204 MW of requested capacity. Federal filings (EIA-860M) list 100 MW of generation as planned or under construction in Sunflower. Grid carbon intensity for Sunflower, via its balancing authority, is 981.982 lb CO2 per MWh in eGRID.
USGS 2015 puts freshwater withdrawals across Sunflower at 284.12 million gallons per day for all uses, a measure of use, not spare supply. Within roughly a 120 km commute of Sunflower, about 4,176 people are employed in construction (BLS QCEW), which speaks to how far crews for a multi-year build would travel, not to labour known to be free.
Read the Sunflower figures as screening-grade context: they describe the surrounding grid, not a specific parcel. The numbers for Sunflower, Mississippi qualify one another, so grid access, substation density, market membership, and rate are meant to be read as a set, not in isolation. Past this screening view, siting in Sunflower, Mississippi turns on a study of a particular address, something no county-level page can stand in for. Every number shown for Sunflower, Mississippi traces to a public source listed below, with its retrieval date, so the provenance is auditable rather than asserted.