Power by county

Perry, MS: data center power outlook

For Perry, Mississippi, the public grid picture begins with its place in the MISO market (Midcontinent Independent System Operator) and the infrastructure mapped inside the county. Grid access across Perry tops out at 161 kV, over a footprint of 11 mapped substations. In Perry, 3 utilities share the retail territory, among them MISSISSIPPI POWER CO, PEARL RIVER VALLEY EL PWR ASSN, SINGING RIVER ELEC COOPERATIVE.

Grid position at a glance

Serving utilities
MISSISSIPPI POWER CO, PEARL RIVER VALLEY EL PWR ASSN, SINGING RIVER ELEC COOPERATIVE
ISO / market
MISO (Midcontinent Independent System Operator)
Highest grid access
161 kV
Substations in county
11
Industrial retail rate
7.4¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
Per-utility rates in county
3 serving utilities: 7.1 to 10.0¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
Interconnection queue
7 projects, 1,010 MW
Proposed generation
None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
Grid carbon intensity
843 lb CO2/MWh
Water withdrawals
24 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
Construction labor near site
28,860 employed in construction within ~120 km (22 of 25 counties reporting)A large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.

Grid conditions in Perry

This page gathers the public grid evidence for Perry, Mississippi that bears on a large new load. The strongest mapped access in Perry is 161 kV, squarely transmission class. Perry carries 11 substations in the mapped layer, spread across the county.

For Perry, the MISO market (Midcontinent Independent System Operator) is the operator that handles interconnection and capacity. The state industrial average retail rate is 7.4 cents per kWh, drawn from EIA-861 and applied to Perry at the state level rather than as a county rate. The serving utilities in Perry that publish a rate range 3 serving utilities: 7.1 to 10.0¢/kWh, a spread kept separate from the state average.

On record for Perry are 7 interconnection-queue projects, totalling 1,010 MW of requested capacity. For Perry, Mississippi, the EIA-860M inventory shows no planned or under-construction generation, a measured absence. Grid carbon intensity for Perry, via its balancing authority, is 842.741 lb CO2 per MWh in eGRID.

USGS 2015 puts freshwater withdrawals across Perry at 24.48 million gallons per day for all uses, a measure of use, not spare supply. Within roughly a 120 km commute of Perry, about 28,860 people are employed in construction (BLS QCEW), which speaks to how far crews for a multi-year build would travel, not to labour known to be free.

Read the Perry figures as screening-grade context: they describe the surrounding grid, not a specific parcel. The numbers for Perry, Mississippi qualify one another, so grid access, substation density, market membership, and rate are meant to be read as a set, not in isolation. Past this screening view, siting in Perry, Mississippi turns on a study of a particular address, something no county-level page can stand in for. Every number shown for Perry, Mississippi traces to a public source listed below, with its retrieval date, so the provenance is auditable rather than asserted.

Sources