Power by county
Issaquena, MS: data center power outlook
Issaquena, Mississippi is served through the MISO market (Midcontinent Independent System Operator), and the figures below describe the public grid around a prospective data center site there. Issaquena carries 1 mapped substation within its boundary, and the highest reachable grid access is 115 kV. Service in Issaquena spans 6 utilities, with ENTERGY ARKANSAS LLC, ENTERGY LOUISIANA LLC, ENTERGY MISSISSIPPI LLC among those mapped.
Grid position at a glance
- Serving utilities
- ENTERGY ARKANSAS LLC, ENTERGY LOUISIANA LLC, ENTERGY MISSISSIPPI LLC, NORTHEAST LOUISIANA POWER COOP INC., TWIN COUNTY ELECTRIC PWR ASSN, YAZOO VALLEY ELEC POWER ASSN
- ISO / market
- MISO (Midcontinent Independent System Operator)
- Highest grid access
- 115 kV
- Substations in county
- 1
- Industrial retail rate
- 7.4¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
- Per-utility rates in county
- 2 of 6 serving utilities: 6.9 to 8.3¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
- Interconnection queue
- None on record
- Proposed generation
- None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
- Grid carbon intensity
- 982 lb CO2/MWh
- Water withdrawals
- 36 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
- Construction labor near site
- 18,648 employed in construction within ~120 km (21 of 26 counties reporting)A large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.
Grid conditions in Issaquena
The material below frames Issaquena, Mississippi for a prospective large load, drawing only on public sources. At 115 kV, Issaquena sits in the transmission class that a large load would look to. The mapped footprint in Issaquena, Mississippi is sparse, 1 substation, so options cluster at those points.
Interconnection over Issaquena runs through the MISO market (Midcontinent Independent System Operator) and its rules. For Issaquena, the rate shown is the state industrial average of 7.4 cents per kWh (EIA-861), a state figure and not a county-specific one. Beneath that state average, the utilities serving Issaquena that report an industrial rate span 2 of 6 serving utilities: 6.9 to 8.3¢/kWh, shown as context and never as the county rate.
Across the covered feeds, Issaquena, Mississippi carries no interconnection-queue project, from either real quiet or a feed not yet loaded. Issaquena, Mississippi has no EIA-860M generation on file, which reads as zero rather than as a gap. Issaquena sits under a balancing authority that eGRID puts at 981.982 lb CO2 per MWh.
Issaquena withdrew 35.75 million gallons per day for all uses in the USGS 2015 data, which counts demand, not headroom. About 18,648 people are employed in construction within a 120 km commute of Issaquena (BLS QCEW), which frames staffing distance rather than free labour.
For Issaquena, treat this as screening-grade county context useful for narrowing a search rather than settling a site. Taken together, the figures for Issaquena, Mississippi describe the grid around a prospective site, drawn from public data with their gaps left visible on purpose. To move past screening in Issaquena, Mississippi, a specific address needs its own interconnection study, which this page does not attempt. The figures for Issaquena, Mississippi refresh as their public datasets do, and the exact sources and dates sit in the source log below this section.