Power by county
Choctaw, MS: data center power outlook
Choctaw, Mississippi is served through an area outside an organized wholesale market, and the figures below describe the public grid around a prospective data center site there. Choctaw carries 11 mapped substations within its boundary, and the highest reachable grid access is 500 kV. Service in Choctaw spans 5 utilities, with 4-COUNTY ELECTRIC POWER ASSN, DELTA ELECTRIC POWER ASSN, EAST MISSISSIPPI ELEC PWR ASSN among those mapped.
Grid position at a glance
- Serving utilities
- 4-COUNTY ELECTRIC POWER ASSN, DELTA ELECTRIC POWER ASSN, EAST MISSISSIPPI ELEC PWR ASSN, ENTERGY MISSISSIPPI LLC, NATCHEZ TRACE ELEC POWER ASSN
- ISO / market
- NON_ISO (Not in an organized wholesale market)
- Highest grid access
- 500 kV
- Substations in county
- 11
- Industrial retail rate
- 7.4¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
- Per-utility rates in county
- 4 of 5 serving utilities: 7.0 to 13.8¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
- Interconnection queue
- 3 projects, 1,500 MW
- Proposed generation
- None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
- Grid carbon intensity
- 641 lb CO2/MWh
- Water withdrawals
- 7.8 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
- Construction labor near site
- 13,248 employed in construction within ~120 km (28 of 30 counties reporting)A large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.
Grid conditions in Choctaw
The material below frames Choctaw, Mississippi for a prospective large load, drawing only on public sources. Grid access in Choctaw extends to 500 kV, a high-voltage line class. The mapped layer places 11 substations across Choctaw, a moderate density.
Sitting outside any organized market, Choctaw, Mississippi handles interconnection through its utility rather than a central operator. For Choctaw, the rate shown is the state industrial average of 7.4 cents per kWh (EIA-861), a state figure and not a county-specific one. Beneath that state average, the utilities serving Choctaw that report an industrial rate span 4 of 5 serving utilities: 7.0 to 13.8¢/kWh, shown as context and never as the county rate.
The queue feeds show 3 projects for Choctaw, totalling 1,500 MW of requested capacity. EIA-860M lists nothing planned or under construction for Choctaw, Mississippi, which is a national filing and so a real zero. Choctaw sits under a balancing authority that eGRID puts at 641.018 lb CO2 per MWh.
Choctaw withdrew 7.8 million gallons per day for all uses in the USGS 2015 data, which counts demand, not headroom. About 13,248 people are employed in construction within a 120 km commute of Choctaw (BLS QCEW), which frames staffing distance rather than free labour.
For Choctaw, treat this as screening-grade county context useful for narrowing a search rather than settling a site. Taken together, the figures for Choctaw, Mississippi describe the grid around a prospective site, drawn from public data with their gaps left visible on purpose. To move past screening in Choctaw, Mississippi, a specific address needs its own interconnection study, which this page does not attempt. The figures for Choctaw, Mississippi refresh as their public datasets do, and the exact sources and dates sit in the source log below this section.