Power by county
Bolivar, MS: data center power outlook
Bolivar, Mississippi is served through the MISO market (Midcontinent Independent System Operator), and the figures below describe the public grid around a prospective data center site there. Bolivar carries 11 mapped substations within its boundary, and the highest reachable grid access is 115 kV. Service in Bolivar spans 5 utilities, with C & L ELECTRIC COOP CORP, COAHOMA ELECTRIC POWER ASSN, DELTA ELECTRIC POWER ASSN among those mapped.
Grid position at a glance
- Serving utilities
- C & L ELECTRIC COOP CORP, COAHOMA ELECTRIC POWER ASSN, DELTA ELECTRIC POWER ASSN, ENTERGY ARKANSAS LLC, ENTERGY MISSISSIPPI LLC
- ISO / market
- MISO (Midcontinent Independent System Operator)
- Highest grid access
- 115 kV
- Substations in county
- 11
- Industrial retail rate
- 7.4¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
- Per-utility rates in county
- 2 of 5 serving utilities: 8.3 to 13.8¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
- Interconnection queue
- 8 projects, 1,055 MW
- Proposed generation
- 80 MW planned or under constructionUnits filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
- Grid carbon intensity
- 982 lb CO2/MWh
- Water withdrawals
- 341 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
- Construction labor near site
- 4,420 employed in construction within ~120 km (22 of 26 counties reporting)A large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.
Grid conditions in Bolivar
The material below frames Bolivar, Mississippi for a prospective large load, drawing only on public sources. At 115 kV, Bolivar sits in the transmission class that a large load would look to. The mapped layer places 11 substations across Bolivar, a moderate density.
Interconnection over Bolivar runs through the MISO market (Midcontinent Independent System Operator) and its rules. For Bolivar, the rate shown is the state industrial average of 7.4 cents per kWh (EIA-861), a state figure and not a county-specific one. Beneath that state average, the utilities serving Bolivar that report an industrial rate span 2 of 5 serving utilities: 8.3 to 13.8¢/kWh, shown as context and never as the county rate.
The queue feeds show 8 projects for Bolivar, totalling 1,055 MW of requested capacity. EIA-860M records 80 MW planned or under construction for Bolivar. Bolivar sits under a balancing authority that eGRID puts at 981.982 lb CO2 per MWh.
Bolivar withdrew 341.14 million gallons per day for all uses in the USGS 2015 data, which counts demand, not headroom. About 4,420 people are employed in construction within a 120 km commute of Bolivar (BLS QCEW), which frames staffing distance rather than free labour.
For Bolivar, treat this as screening-grade county context useful for narrowing a search rather than settling a site. Taken together, the figures for Bolivar, Mississippi describe the grid around a prospective site, drawn from public data with their gaps left visible on purpose. To move past screening in Bolivar, Mississippi, a specific address needs its own interconnection study, which this page does not attempt. The figures for Bolivar, Mississippi refresh as their public datasets do, and the exact sources and dates sit in the source log below this section.