Swift, Minnesota is served through the MISO market (Midcontinent Independent System Operator), and the figures below describe the public grid around a prospective data center site there. Swift carries 26 mapped substations within its boundary, and the highest reachable grid access is 230 kV. Service in Swift spans 7 utilities, with AGRALITE ELECTRIC COOP, CITY OF BENSON - (MN), H-D ELECTRIC COOP INC among those mapped.

Grid position at a glance

Serving utilities
AGRALITE ELECTRIC COOP, CITY OF BENSON - (MN), H-D ELECTRIC COOP INC, KANDIYOHI POWER COOP, MINNESOTA VALLEY COOP L&P ASSN, OTTER TAIL POWER CO, WAPA-- WESTERN AREA POWER ADMINISTRATION
ISO / market
MISO (Midcontinent Independent System Operator)
Highest grid access
230 kV
Substations in county
26
Industrial retail rate
9.3¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
Per-utility rates in county
3 of 7 serving utilities: 5.4 to 9.0¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
Interconnection queue
2 projects, 390 MW
Proposed generation
None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
Grid carbon intensity
982 lb CO2/MWh
Water withdrawals
16 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
Construction labor near site
13,415 employed in construction within ~120 kmA large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.

Grid conditions in Swift

What follows is a screening-grade read of Swift, Minnesota, built only from named public datasets. At 230 kV, Swift sits in the transmission class that a large load would look to. The mapped layer packs 26 substations into Swift, a dense spread of options.

Interconnection over Swift runs through the MISO market (Midcontinent Independent System Operator) and its rules. For Swift, the rate shown is the state industrial average of 9.3 cents per kWh (EIA-861), a state figure and not a county-specific one. Beneath that state average, the utilities serving Swift that report an industrial rate span 3 of 7 serving utilities: 5.4 to 9.0¢/kWh, shown as context and never as the county rate.

The queue feeds show 2 projects for Swift, totalling 390 MW of requested capacity. EIA-860M lists nothing planned or under construction for Swift, Minnesota, which is a national filing and so a real zero. Swift sits under a balancing authority that eGRID puts at 981.982 lb CO2 per MWh.

Swift withdrew 15.92 million gallons per day for all uses in the USGS 2015 data, which counts demand, not headroom. About 13,415 people are employed in construction within a 120 km commute of Swift (BLS QCEW), which frames staffing distance rather than free labour.

For Swift, treat this as screening-grade county context useful for narrowing a search rather than settling a site. Taken together, the figures for Swift, Minnesota describe the grid around a prospective site, drawn from public data with their gaps left visible on purpose. To move past screening in Swift, Minnesota, a specific address needs its own interconnection study, which this page does not attempt. The figures for Swift, Minnesota refresh as their public datasets do, and the exact sources and dates sit in the source log below this section.