Power by county

Stevens, MN: data center power outlook

The grid around Stevens, Minnesota is summarized here from public data, starting from the county's position in the MISO market (Midcontinent Independent System Operator). Inside Stevens the mapped layer shows 16 mapped substations, with grid access reaching 400 kV at its strongest point. Retail service across Stevens is split among 5 utilities, among them AGRALITE ELECTRIC COOP, OTTER TAIL POWER CO, RUNESTONE ELECTRIC ASSN.

Grid position at a glance

Serving utilities
AGRALITE ELECTRIC COOP, OTTER TAIL POWER CO, RUNESTONE ELECTRIC ASSN, TRAVERSE ELECTRIC COOP, INC, WAPA-- WESTERN AREA POWER ADMINISTRATION
ISO / market
MISO (Midcontinent Independent System Operator)
Highest grid access
400 kV
Substations in county
16
Industrial retail rate
9.3¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
Per-utility rates in county
3 of 5 serving utilities: 5.4 to 10.9¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
Interconnection queue
3 projects, 745 MW
Proposed generation
None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
Grid carbon intensity
982 lb CO2/MWh
Water withdrawals
7.9 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
Construction labor near site
14,668 employed in construction within ~120 kmA large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.

Grid conditions in Stevens

The sections below set out what public data shows about siting a large electrical load in Stevens, Minnesota. At 400 kV, Stevens carries high-voltage transmission at its strongest mapped point. Stevens contains 16 mapped substations, a moderate footprint spread across the service area.

Wholesale activity over Stevens clears through the MISO market (Midcontinent Independent System Operator), whose footprint sets how interconnection requests and capacity are handled. Stevens carries the state industrial average retail rate of 9.3 cents per kWh from EIA-861, applied statewide. For Stevens, the per-utility spread is 3 of 5 serving utilities: 5.4 to 10.9¢/kWh, which qualifies but never replaces the state average.

Stevens carries 3 projects in the interconnection queue, totalling 745 MW of requested capacity. For Stevens, Minnesota, the EIA-860M inventory shows no planned or under-construction generation, a measured absence. In eGRID, the balancing authority over Stevens shows 981.982 lb CO2 per MWh.

For Stevens, the USGS 2015 compilation records 7.92 million gallons per day of all-use freshwater withdrawals, not water available to a new load. Stevens sits within commuting range of roughly 14,668 construction workers (BLS QCEW, about 120 km), most already committed elsewhere.

Every figure for Stevens here is screening-grade and describes the county as a whole, not any single parcel within it. None of the figures for Stevens, Minnesota settles a site on its own; each one qualifies the others, and all of them come from public federal and state datasets. Settling a site in Stevens, Minnesota requires a study of the specific parcel, a step beyond the county-level picture drawn here. Sources and data dates for Stevens, Minnesota are logged directly below, so each figure on this page can be traced back to its public dataset.

Sources