Power by county

Rock, MN: data center power outlook

Rock, Minnesota is served through the SPP market (Southwest Power Pool), and the figures below describe the public grid around a prospective data center site there. Rock carries 17 mapped substations within its boundary, and the highest reachable grid access is 345 kV. Service in Rock spans 9 utilities, with CITY OF BIGELOW - (MN), CITY OF LUVERNE - (MN), INTERSTATE POWER AND LIGHT CO among those mapped.

Grid position at a glance

Serving utilities
CITY OF BIGELOW - (MN), CITY OF LUVERNE - (MN), INTERSTATE POWER AND LIGHT CO, LYON RURAL ELECTRIC COOP, MIDAMERICAN ENERGY CO, NOBLES COOPERATIVE ELECTRIC, NORTHERN STATES POWER CO - MINNESOTA, SIOUX VALLEY SW ELEC COOP, WAPA-- WESTERN AREA POWER ADMINISTRATION
ISO / market
SPP (Southwest Power Pool)
Highest grid access
345 kV
Substations in county
17
Industrial retail rate
9.3¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
Per-utility rates in county
2 of 9 serving utilities: 9.7 to 9.8¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
Interconnection queue
6 projects, 862 MW
Proposed generation
None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
Grid carbon intensity
982 lb CO2/MWh
Water withdrawals
3.4 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
Construction labor near site
22,123 employed in construction within ~120 kmA large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.

Grid conditions in Rock

What follows is a screening-grade read of Rock, Minnesota, built only from named public datasets. Grid access in Rock extends to 345 kV, a high-voltage line class. The mapped layer places 17 substations across Rock, a moderate density.

Interconnection over Rock runs through the SPP market (Southwest Power Pool) and its rules. For Rock, the rate shown is the state industrial average of 9.3 cents per kWh (EIA-861), a state figure and not a county-specific one. Beneath that state average, the utilities serving Rock that report an industrial rate span 2 of 9 serving utilities: 9.7 to 9.8¢/kWh, shown as context and never as the county rate.

The queue feeds show 6 projects for Rock, totalling 862 MW of requested capacity. Rock, Minnesota has no EIA-860M generation on file, which reads as zero rather than as a gap. Rock sits under a balancing authority that eGRID puts at 981.982 lb CO2 per MWh.

Rock withdrew 3.38 million gallons per day for all uses in the USGS 2015 data, which counts demand, not headroom. About 22,123 people are employed in construction within a 120 km commute of Rock (BLS QCEW), which frames staffing distance rather than free labour.

For Rock, treat this as screening-grade county context useful for narrowing a search rather than settling a site. Taken together, the figures for Rock, Minnesota describe the grid around a prospective site, drawn from public data with their gaps left visible on purpose. To move past screening in Rock, Minnesota, a specific address needs its own interconnection study, which this page does not attempt. The figures for Rock, Minnesota refresh as their public datasets do, and the exact sources and dates sit in the source log below this section.