Power by county
Meeker, MN: data center power outlook
The grid around Meeker, Minnesota is summarized here from public data, starting from the county's position in the MISO market (Midcontinent Independent System Operator). Inside Meeker the mapped layer shows 30 mapped substations, with grid access reaching 400 kV at its strongest point. Retail service across Meeker is split among 6 utilities, among them CITY OF GROVE CITY, LITCHFIELD PUBLIC UTILITIES, MCLEOD COOPERATIVE POWER ASSN.
Grid position at a glance
- Serving utilities
- CITY OF GROVE CITY, LITCHFIELD PUBLIC UTILITIES, MCLEOD COOPERATIVE POWER ASSN, MEEKER COOP LIGHT & POWER ASSN, NORTHERN STATES POWER CO - MINNESOTA, WRIGHT-HENNEPIN COOP ELEC ASSN
- ISO / market
- MISO (Midcontinent Independent System Operator)
- Highest grid access
- 400 kV
- Substations in county
- 30
- Industrial retail rate
- 9.3¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
- Per-utility rates in county
- 3 of 6 serving utilities: 8.2 to 10.2¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
- Interconnection queue
- 2 projects, 700 MW
- Proposed generation
- None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
- Grid carbon intensity
- 982 lb CO2/MWh
- Water withdrawals
- 5.6 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
- Construction labor near site
- 92,247 employed in construction within ~120 kmA large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.
Grid conditions in Meeker
The sections below set out what public data shows about siting a large electrical load in Meeker, Minnesota. At 400 kV, Meeker carries high-voltage transmission at its strongest mapped point. Meeker contains 30 mapped substations, a dense footprint that spreads interconnection options across many points.
Wholesale activity over Meeker clears through the MISO market (Midcontinent Independent System Operator), whose footprint sets how interconnection requests and capacity are handled. Meeker carries the state industrial average retail rate of 9.3 cents per kWh from EIA-861, applied statewide. For Meeker, the per-utility spread is 3 of 6 serving utilities: 8.2 to 10.2¢/kWh, which qualifies but never replaces the state average.
Meeker carries 2 projects in the interconnection queue, totalling 700 MW of requested capacity. The federal EIA-860M inventory files no planned or under-construction generation in Meeker, Minnesota, a real zero rather than a gap. In eGRID, the balancing authority over Meeker shows 981.982 lb CO2 per MWh.
For Meeker, the USGS 2015 compilation records 5.64 million gallons per day of all-use freshwater withdrawals, not water available to a new load. Meeker sits within commuting range of roughly 92,247 construction workers (BLS QCEW, about 120 km), most already committed elsewhere.
Every figure for Meeker here is screening-grade and describes the county as a whole, not any single parcel within it. None of the figures for Meeker, Minnesota settles a site on its own; each one qualifies the others, and all of them come from public federal and state datasets. Settling a site in Meeker, Minnesota requires a study of the specific parcel, a step beyond the county-level picture drawn here. Sources and data dates for Meeker, Minnesota are logged directly below, so each figure on this page can be traced back to its public dataset.