Power by county
Lyon, MN: data center power outlook
Lyon, Minnesota is served through the SPP market (Southwest Power Pool), and the figures below describe the public grid around a prospective data center site there. Lyon carries 34 mapped substations within its boundary, and the highest reachable grid access is 345 kV. Service in Lyon spans 9 utilities, with CITY OF MARSHALL - (MN), H-D ELECTRIC COOP INC, LYON ELECTRIC COOPERATIVE, INC. among those mapped.
Grid position at a glance
- Serving utilities
- CITY OF MARSHALL - (MN), H-D ELECTRIC COOP INC, LYON ELECTRIC COOPERATIVE, INC., MINNESOTA VALLEY COOP L&P ASSN, NOBLES COOPERATIVE ELECTRIC, NORTHERN STATES POWER CO - MINNESOTA, OTTER TAIL POWER CO, REDWOOD ELECTRIC COOP, WAPA-- WESTERN AREA POWER ADMINISTRATION
- ISO / market
- SPP (Southwest Power Pool)
- Highest grid access
- 345 kV
- Substations in county
- 34
- Industrial retail rate
- 9.3¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
- Per-utility rates in county
- 4 of 9 serving utilities: 5.4 to 9.7¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
- Interconnection queue
- 9 projects, 1,783 MW
- Proposed generation
- 420 MW planned or under constructionUnits filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
- Grid carbon intensity
- 982 lb CO2/MWh
- Water withdrawals
- 6.1 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
- Construction labor near site
- 18,600 employed in construction within ~120 kmA large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.
Grid conditions in Lyon
The material below frames Lyon, Minnesota for a prospective large load, drawing only on public sources. Grid access in Lyon extends to 345 kV, a high-voltage line class. The mapped layer packs 34 substations into Lyon, a dense spread of options.
Interconnection over Lyon runs through the SPP market (Southwest Power Pool) and its rules. For Lyon, the rate shown is the state industrial average of 9.3 cents per kWh (EIA-861), a state figure and not a county-specific one. Beneath that state average, the utilities serving Lyon that report an industrial rate span 4 of 9 serving utilities: 5.4 to 9.7¢/kWh, shown as context and never as the county rate.
The queue feeds show 9 projects for Lyon, totalling 1,782.5 MW of requested capacity. EIA-860M records 420 MW planned or under construction for Lyon. Lyon sits under a balancing authority that eGRID puts at 981.982 lb CO2 per MWh.
Lyon withdrew 6.1 million gallons per day for all uses in the USGS 2015 data, which counts demand, not headroom. About 18,600 people are employed in construction within a 120 km commute of Lyon (BLS QCEW), which frames staffing distance rather than free labour.
For Lyon, treat this as screening-grade county context useful for narrowing a search rather than settling a site. Taken together, the figures for Lyon, Minnesota describe the grid around a prospective site, drawn from public data with their gaps left visible on purpose. To move past screening in Lyon, Minnesota, a specific address needs its own interconnection study, which this page does not attempt. The figures for Lyon, Minnesota refresh as their public datasets do, and the exact sources and dates sit in the source log below this section.