Kanabec, MN: data center power outlook

Kanabec, Minnesota is served through the MISO market (Midcontinent Independent System Operator), and the figures below describe the public grid around a prospective data center site there. Kanabec carries 4 mapped substations within its boundary, and the highest reachable grid access is 69 kV. Service in Kanabec spans 2 utilities, with CITY OF MORA - (MN), EAST CENTRAL ENERGY among those mapped.

Grid position at a glance

Serving utilities
CITY OF MORA - (MN), EAST CENTRAL ENERGY
ISO / market
MISO (Midcontinent Independent System Operator)
Highest grid access
69 kV
Substations in county
4
Industrial retail rate
9.3¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
Per-utility rates in county
1 of 2 serving utilities: 8.3¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
Interconnection queue
None on record
Proposed generation
None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
Grid carbon intensity
982 lb CO2/MWh
Water withdrawals
1.5 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
Construction labor near site
87,476 employed in construction within ~120 kmA large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.

Grid conditions in Kanabec

What follows is a screening-grade read of Kanabec, Minnesota, built only from named public datasets. At 69 kV, the strongest mapped access in Kanabec is sub-transmission class. Kanabec, Minnesota carries a thin 4-substation footprint in the mapped layer, concentrating where a connection could land.

Interconnection over Kanabec runs through the MISO market (Midcontinent Independent System Operator) and its rules. For Kanabec, the rate shown is the state industrial average of 9.3 cents per kWh (EIA-861), a state figure and not a county-specific one. Beneath that state average, the utilities serving Kanabec that report an industrial rate span 1 of 2 serving utilities: 8.3¢/kWh, shown as context and never as the county rate.

The covered queue feeds list nothing for Kanabec, Minnesota, which may be quiet or simply uningested. EIA-860M lists nothing planned or under construction for Kanabec, Minnesota, which is a national filing and so a real zero. Kanabec sits under a balancing authority that eGRID puts at 981.982 lb CO2 per MWh.

Kanabec withdrew 1.47 million gallons per day for all uses in the USGS 2015 data, which counts demand, not headroom. About 87,476 people are employed in construction within a 120 km commute of Kanabec (BLS QCEW), which frames staffing distance rather than free labour.

For Kanabec, treat this as screening-grade county context useful for narrowing a search rather than settling a site. Taken together, the figures for Kanabec, Minnesota describe the grid around a prospective site, drawn from public data with their gaps left visible on purpose. To move past screening in Kanabec, Minnesota, a specific address needs its own interconnection study, which this page does not attempt. The figures for Kanabec, Minnesota refresh as their public datasets do, and the exact sources and dates sit in the source log below this section.