Baraga, MI: data center power outlook
Baraga, Michigan is served through the MISO market (Midcontinent Independent System Operator), and the figures below describe the public grid around a prospective data center site there. Baraga carries 5 mapped substations within its boundary, and the highest reachable grid access is 138 kV. Service in Baraga spans 11 utilities, with ALGER-DELTA COOP ELECTRIC ASSN, CITY OF CRYSTAL FALLS, CITY OF NEGAUNEE among those mapped.
Grid position at a glance
- Serving utilities
- ALGER-DELTA COOP ELECTRIC ASSN, CITY OF CRYSTAL FALLS, CITY OF NEGAUNEE, DTE ELECTRIC COMPANY, ONTONAGON COUNTY R E A, UPPER MICHIGAN ENERGY RESOURCES CORP., UPPER PENINSULA POWER COMPANY, VILLAGE OF BARAGA - (MI), VILLAGE OF L'ANSE - (MI), WISCONSIN ELECTRIC POWER CO, WPPI ENERGY
- ISO / market
- MISO (Midcontinent Independent System Operator)
- Highest grid access
- 138 kV
- Substations in county
- 5
- Industrial retail rate
- 8.6¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
- Per-utility rates in county
- 4 of 11 serving utilities: 5.3 to 12.6¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
- Interconnection queue
- 6 projects, 447 MW
- Proposed generation
- None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
- Grid carbon intensity
- 982 lb CO2/MWh
- Water withdrawals
- 15 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
- Construction labor near site
- 5,641 employed in construction within ~120 kmA large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.
Grid conditions in Baraga
The material below frames Baraga, Michigan for a prospective large load, drawing only on public sources. At 138 kV, Baraga sits in the transmission class that a large load would look to. Only 5 substations is mapped in Baraga, Michigan, keeping interconnection points few.
Interconnection over Baraga runs through the MISO market (Midcontinent Independent System Operator) and its rules. For Baraga, the rate shown is the state industrial average of 8.6 cents per kWh (EIA-861), a state figure and not a county-specific one. Beneath that state average, the utilities serving Baraga that report an industrial rate span 4 of 11 serving utilities: 5.3 to 12.6¢/kWh, shown as context and never as the county rate.
The queue feeds show 6 projects for Baraga, totalling 446.7 MW of requested capacity. Baraga, Michigan has no EIA-860M generation on file, which reads as zero rather than as a gap. Baraga sits under a balancing authority that eGRID puts at 981.982 lb CO2 per MWh.
Baraga withdrew 14.93 million gallons per day for all uses in the USGS 2015 data, which counts demand, not headroom. About 5,641 people are employed in construction within a 120 km commute of Baraga (BLS QCEW), which frames staffing distance rather than free labour.
For Baraga, treat this as screening-grade county context useful for narrowing a search rather than settling a site. Taken together, the figures for Baraga, Michigan describe the grid around a prospective site, drawn from public data with their gaps left visible on purpose. To move past screening in Baraga, Michigan, a specific address needs its own interconnection study, which this page does not attempt. The figures for Baraga, Michigan refresh as their public datasets do, and the exact sources and dates sit in the source log below this section.