Power by county

Talbot, MD: data center power outlook

The grid around Talbot, Maryland is summarized here from public data, starting from the county's position in the PJM market (PJM Interconnection). Inside Talbot the mapped layer shows 18 mapped substations, with grid access reaching 138 kV at its strongest point. Retail service across Talbot is split among 3 utilities, among them CHOPTANK ELECTRIC COOPERATIVE, INC, DELMARVA POWER, EASTON UTILITIES COMM.

Grid position at a glance

Serving utilities
CHOPTANK ELECTRIC COOPERATIVE, INC, DELMARVA POWER, EASTON UTILITIES COMM
ISO / market
PJM (PJM Interconnection)
Highest grid access
138 kV
Substations in county
18
Industrial retail rate
12.5¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
Per-utility rates in county
2 of 3 serving utilities: 3.7 to 11.1¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
Interconnection queue
None on record
Proposed generation
None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
Grid carbon intensity
716 lb CO2/MWh
Water withdrawals
6.7 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
Construction labor near site
242,306 employed in construction within ~120 km (40 of 41 counties reporting)A large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.

Grid conditions in Talbot

Read on for the public power picture of Talbot in Maryland, assembled for data center siting. Transmission-class access reaches 138 kV in Talbot at its strongest mapped point. Talbot contains 18 mapped substations, a moderate footprint spread across the service area.

Wholesale activity over Talbot clears through the PJM market (PJM Interconnection), whose footprint sets how interconnection requests and capacity are handled. Talbot carries the state industrial average retail rate of 12.5 cents per kWh from EIA-861, applied statewide. For Talbot, the per-utility spread is 2 of 3 serving utilities: 3.7 to 11.1¢/kWh, which qualifies but never replaces the state average.

Talbot, Maryland shows no interconnection-queue project in the covered feeds, whether from real quiet or a feed not yet loaded. For Talbot, Maryland, the EIA-860M inventory shows no planned or under-construction generation, a measured absence. In eGRID, the balancing authority over Talbot shows 716.09 lb CO2 per MWh.

For Talbot, the USGS 2015 compilation records 6.73 million gallons per day of all-use freshwater withdrawals, not water available to a new load. Talbot sits within commuting range of roughly 242,306 construction workers (BLS QCEW, about 120 km), most already committed elsewhere.

Every figure for Talbot here is screening-grade and describes the county as a whole, not any single parcel within it. None of the figures for Talbot, Maryland settles a site on its own; each one qualifies the others, and all of them come from public federal and state datasets. Settling a site in Talbot, Maryland requires a study of the specific parcel, a step beyond the county-level picture drawn here. Sources and data dates for Talbot, Maryland are logged directly below, so each figure on this page can be traced back to its public dataset.