Power by county

Calvert, MD: data center power outlook

The grid around Calvert, Maryland is summarized here from public data, starting from the county's position in the PJM market (PJM Interconnection). Inside Calvert the mapped layer shows 20 mapped substations, with grid access reaching 500 kV at its strongest point. Retail service across Calvert is split among 2 utilities, among them BALTIMORE GAS & ELECTRIC CO, SOUTHERN MARYLAND ELEC COOP INC.

Grid position at a glance

Serving utilities
BALTIMORE GAS & ELECTRIC CO, SOUTHERN MARYLAND ELEC COOP INC
ISO / market
PJM (PJM Interconnection)
Highest grid access
500 kV
Substations in county
20
Industrial retail rate
12.5¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
Per-utility rates in county
1 of 2 serving utilities: 3.9¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
Interconnection queue
None on record
Proposed generation
None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
Grid carbon intensity
716 lb CO2/MWh
Water withdrawals
7.6 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
Construction labor near site
256,763 employed in construction within ~120 km (46 of 47 counties reporting)A large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.

Grid conditions in Calvert

The sections below set out what public data shows about siting a large electrical load in Calvert, Maryland. At 500 kV, Calvert carries high-voltage transmission at its strongest mapped point. Calvert contains 20 mapped substations, a moderate footprint spread across the service area.

Wholesale activity over Calvert clears through the PJM market (PJM Interconnection), whose footprint sets how interconnection requests and capacity are handled. Calvert carries the state industrial average retail rate of 12.5 cents per kWh from EIA-861, applied statewide. For Calvert, the per-utility spread is 1 of 2 serving utilities: 3.9¢/kWh, which qualifies but never replaces the state average.

For Calvert, Maryland, no queued project appears in the feeds currently covered. No generation is filed as planned or under construction in Calvert, Maryland in the federal EIA-860M inventory, a measured zero rather than missing data. In eGRID, the balancing authority over Calvert shows 716.09 lb CO2 per MWh.

For Calvert, the USGS 2015 compilation records 7.61 million gallons per day of all-use freshwater withdrawals, not water available to a new load. Calvert sits within commuting range of roughly 256,763 construction workers (BLS QCEW, about 120 km), most already committed elsewhere.

Every figure for Calvert here is screening-grade and describes the county as a whole, not any single parcel within it. None of the figures for Calvert, Maryland settles a site on its own; each one qualifies the others, and all of them come from public federal and state datasets. Settling a site in Calvert, Maryland requires a study of the specific parcel, a step beyond the county-level picture drawn here. Sources and data dates for Calvert, Maryland are logged directly below, so each figure on this page can be traced back to its public dataset.

Sources