Power by county

Cumberland, ME: data center power outlook

Cumberland sits in the ISONE market (ISO New England); what follows is the screening-grade grid picture for Cumberland, Maine, drawn from public datasets. Counting from the mapped infrastructure, Cumberland holds 32 mapped substations and reaches 345 kV. CENTRAL MAINE POWER CO holds the retail service territory covering Cumberland.

Grid position at a glance

Serving utilities
CENTRAL MAINE POWER CO
ISO / market
ISONE (ISO New England)
Highest grid access
345 kV
Substations in county
32
Industrial retail rate
15.5¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
Per-utility rates in county
1 serving utility: 5.0¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
Interconnection queue
None on record
Proposed generation
27 MW planned or under constructionUnits filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
Grid carbon intensity
541 lb CO2/MWh
Water withdrawals
53 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
Construction labor near site
44,554 employed in construction within ~120 kmA large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.

Grid conditions in Cumberland

Everything here about Cumberland, Maine comes from public federal and state records, with the gaps left visible. Cumberland reaches 345 kV, a high-voltage transmission class, at its strongest mapped point of grid access. With 32 substations mapped, Cumberland offers interconnection points across many locations.

Cumberland falls inside the ISONE market (ISO New England), which governs how its interconnection requests and capacity move. The rate for Cumberland is the 15.5 cents per kWh state industrial average (EIA-861), the same figure the map colours by. Across Cumberland, reported per-utility industrial rates cover 1 serving utility: 5.0¢/kWh, offered only as context beneath the state figure.

The covered queue feeds list nothing for Cumberland, Maine, which may be quiet or simply uningested. Cumberland has 27.1 MW of planned or under-construction generation on file in EIA-860M. The balancing authority covering Cumberland carries a grid carbon intensity of 541.365 lb CO2 per MWh in eGRID.

Reported freshwater withdrawals for all uses in Cumberland are 52.99 million gallons per day in the USGS 2015 compilation, existing demand rather than water free for a new load. Around Cumberland, some 44,554 people work in construction within about a 120 km commute (BLS QCEW), a measure of reach, not of available crews.

These numbers for Cumberland are screening-grade context for the whole county, drawn from public data with the gaps left visible. Read the figures for Cumberland, Maine together rather than one at a time: grid access matters less without substations near it, and a quiet queue reads differently inside an organized market than outside one. The next step for Cumberland, Maine is an address-level interconnection study; the county figures here only narrow where to look. For Cumberland, Maine, the source log below records where each figure comes from and when it was pulled, keeping the provenance visible.

Sources