Power by county

Androscoggin, ME: data center power outlook

Androscoggin sits in the ISONE market (ISO New England); what follows is the screening-grade grid picture for Androscoggin, Maine, drawn from public datasets. Counting from the mapped infrastructure, Androscoggin holds 17 mapped substations and reaches 345 kV. CENTRAL MAINE POWER CO holds the retail service territory covering Androscoggin.

Grid position at a glance

Serving utilities
CENTRAL MAINE POWER CO
ISO / market
ISONE (ISO New England)
Highest grid access
345 kV
Substations in county
17
Industrial retail rate
15.5¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
Per-utility rates in county
1 serving utility: 5.0¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
Interconnection queue
None on record
Proposed generation
30 MW planned or under constructionUnits filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
Grid carbon intensity
541 lb CO2/MWh
Water withdrawals
16 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
Construction labor near site
29,928 employed in construction within ~120 kmA large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.

Grid conditions in Androscoggin

Below, Androscoggin in Maine is described from public data as a starting point for siting diligence. Androscoggin reaches 345 kV, a high-voltage transmission class, at its strongest mapped point of grid access. With 17 substations mapped, Androscoggin has a moderate spread of interconnection points.

Androscoggin falls inside the ISONE market (ISO New England), which governs how its interconnection requests and capacity move. The rate for Androscoggin is the 15.5 cents per kWh state industrial average (EIA-861), the same figure the map colours by. Across Androscoggin, reported per-utility industrial rates cover 1 serving utility: 5.0¢/kWh, offered only as context beneath the state figure.

No interconnection-queue project is on record for Androscoggin, Maine in the covered feeds, which reflects either genuine quiet or a queue not yet ingested. Androscoggin has 29.8 MW of planned or under-construction generation on file in EIA-860M. The balancing authority covering Androscoggin carries a grid carbon intensity of 541.365 lb CO2 per MWh in eGRID.

Reported freshwater withdrawals for all uses in Androscoggin are 15.78 million gallons per day in the USGS 2015 compilation, existing demand rather than water free for a new load. Around Androscoggin, some 29,928 people work in construction within about a 120 km commute (BLS QCEW), a measure of reach, not of available crews.

These numbers for Androscoggin are screening-grade context for the whole county, drawn from public data with the gaps left visible. Read the figures for Androscoggin, Maine together rather than one at a time: grid access matters less without substations near it, and a quiet queue reads differently inside an organized market than outside one. The next step for Androscoggin, Maine is an address-level interconnection study; the county figures here only narrow where to look. For Androscoggin, Maine, the source log below records where each figure comes from and when it was pulled, keeping the provenance visible.

Sources