Power by county
Winn, LA: data center power outlook
Winn, Louisiana is served through the SPP market (Southwest Power Pool), and the figures below describe the public grid around a prospective data center site there. Winn carries 10 mapped substations within its boundary, and the highest reachable grid access is 230 kV. Service in Winn spans 8 utilities, with CITY OF WINNFIELD - (LA), CLAIBORNE ELECTRIC COOP, INC, CLECO POWER LLC among those mapped.
Grid position at a glance
- Serving utilities
- CITY OF WINNFIELD - (LA), CLAIBORNE ELECTRIC COOP, INC, CLECO POWER LLC, CONCORDIA ELECTRIC COOP, INC, ENTERGY LOUISIANA LLC, NORTHEAST LOUISIANA POWER COOP INC., SOUTHWEST LOUISIANA E M C, SOUTHWESTERN ELECTRIC POWER CO
- ISO / market
- SPP (Southwest Power Pool)
- Highest grid access
- 230 kV
- Substations in county
- 10
- Industrial retail rate
- 6.2¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
- Per-utility rates in county
- 7 of 8 serving utilities: 5.2 to 19.4¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
- Interconnection queue
- 4 projects, 520 MW
- Proposed generation
- None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
- Grid carbon intensity
- 982 lb CO2/MWh
- Water withdrawals
- 2.7 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
- Construction labor near site
- 14,112 employed in construction within ~120 km (21 of 23 counties reporting)A large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.
Grid conditions in Winn
The material below frames Winn, Louisiana for a prospective large load, drawing only on public sources. At 230 kV, Winn sits in the transmission class that a large load would look to. The mapped layer places 10 substations across Winn, a moderate density.
Interconnection over Winn runs through the SPP market (Southwest Power Pool) and its rules. For Winn, the rate shown is the state industrial average of 6.2 cents per kWh (EIA-861), a state figure and not a county-specific one. Beneath that state average, the utilities serving Winn that report an industrial rate span 7 of 8 serving utilities: 5.2 to 19.4¢/kWh, shown as context and never as the county rate.
The queue feeds show 4 projects for Winn, totalling 520 MW of requested capacity. Winn, Louisiana has no EIA-860M generation on file, which reads as zero rather than as a gap. Winn sits under a balancing authority that eGRID puts at 981.982 lb CO2 per MWh.
Winn withdrew 2.65 million gallons per day for all uses in the USGS 2015 data, which counts demand, not headroom. About 14,112 people are employed in construction within a 120 km commute of Winn (BLS QCEW), which frames staffing distance rather than free labour.
For Winn, treat this as screening-grade county context useful for narrowing a search rather than settling a site. Taken together, the figures for Winn, Louisiana describe the grid around a prospective site, drawn from public data with their gaps left visible on purpose. To move past screening in Winn, Louisiana, a specific address needs its own interconnection study, which this page does not attempt. The figures for Winn, Louisiana refresh as their public datasets do, and the exact sources and dates sit in the source log below this section.