Estill, KY: data center power outlook
Estill sits in an area outside an organized wholesale market; what follows is the screening-grade grid picture for Estill, Kentucky, drawn from public datasets. Counting from the mapped infrastructure, Estill holds 8 mapped substations and reaches 161 kV. Estill is covered by 6 retail service territories, including BLUE GRASS ENERGY COOP CORP, CLARK ENERGY COOP INC - (KY), EAST KENTUCKY POWER COOP, INC.
Grid position at a glance
- Serving utilities
- BLUE GRASS ENERGY COOP CORP, CLARK ENERGY COOP INC - (KY), EAST KENTUCKY POWER COOP, INC, JACKSON ENERGY COOP CORP - (KY), KENTUCKY UTILITIES CO, LICKING VALLEY RURAL E C C
- ISO / market
- NON_ISO (Not in an organized wholesale market)
- Highest grid access
- 161 kV
- Substations in county
- 8
- Industrial retail rate
- 7.0¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
- Per-utility rates in county
- 5 of 6 serving utilities: 7.1 to 8.8¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
- Interconnection queue
- None on record
- Proposed generation
- 3 MW planned or under constructionUnits filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
- Grid carbon intensity
- 1,894 lb CO2/MWh
- Water withdrawals
- 1.5 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
- Construction labor near site
- 26,683 employed in construction within ~120 km (42 of 55 counties reporting)A large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.
Grid conditions in Estill
Below, Estill in Kentucky is described from public data as a starting point for siting diligence. Estill reaches 161 kV at its highest mapped voltage, a transmission class that can carry a substantial interconnection where capacity exists. With 8 substations mapped, Estill has a moderate spread of interconnection points.
Because Estill, Kentucky sits outside an organized market, capacity and interconnection are handled by the utility and bilateral deals, not a market operator. The rate for Estill is the 7.0 cents per kWh state industrial average (EIA-861), the same figure the map colours by. Across Estill, reported per-utility industrial rates cover 5 of 6 serving utilities: 7.1 to 8.8¢/kWh, offered only as context beneath the state figure.
The covered queue feeds list nothing for Estill, Kentucky, which may be quiet or simply uningested. Estill has 2.8 MW of planned or under-construction generation on file in EIA-860M. The balancing authority covering Estill carries a grid carbon intensity of 1,894.234 lb CO2 per MWh in eGRID.
Reported freshwater withdrawals for all uses in Estill are 1.52 million gallons per day in the USGS 2015 compilation, existing demand rather than water free for a new load. Around Estill, some 26,683 people work in construction within about a 120 km commute (BLS QCEW), a measure of reach, not of available crews.
These numbers for Estill are screening-grade context for the whole county, drawn from public data with the gaps left visible. Read the figures for Estill, Kentucky together rather than one at a time: grid access matters less without substations near it, and a quiet queue reads differently inside an organized market than outside one. The next step for Estill, Kentucky is an address-level interconnection study; the county figures here only narrow where to look. For Estill, Kentucky, the source log below records where each figure comes from and when it was pulled, keeping the provenance visible.