Sherman, KS: data center power outlook
Sherman sits in the SPP market (Southwest Power Pool); what follows is the screening-grade grid picture for Sherman, Kansas, drawn from public datasets. Counting from the mapped infrastructure, Sherman holds 7 mapped substations and reaches 115 kV. Sherman is covered by 5 retail service territories, including CITY OF GOODLAND - (KS), LANE-SCOTT ELECTRIC COOP, INC, MIDWEST ENERGY INC.
Grid position at a glance
- Serving utilities
- CITY OF GOODLAND - (KS), LANE-SCOTT ELECTRIC COOP, INC, MIDWEST ENERGY INC, PRAIRIE LAND ELECTRIC COOP INC, WHEATLAND ELECTRIC COOP, INC
- ISO / market
- SPP (Southwest Power Pool)
- Highest grid access
- 115 kV
- Substations in county
- 7
- Industrial retail rate
- 8.0¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
- Per-utility rates in county
- 3 of 5 serving utilities: 7.6 to 10.8¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
- Interconnection queue
- None on record
- Proposed generation
- None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
- Grid carbon intensity
- 872 lb CO2/MWh
- Water withdrawals
- 105 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
- Construction labor near site
- 856 employed in construction within ~120 km (12 of 17 counties reporting)A large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.
Grid conditions in Sherman
Everything here about Sherman, Kansas comes from public federal and state records, with the gaps left visible. Sherman reaches 115 kV at its highest mapped voltage, a transmission class that can carry a substantial interconnection where capacity exists. With 7 substations mapped, Sherman has a moderate spread of interconnection points.
Sherman falls inside the SPP market (Southwest Power Pool), which governs how its interconnection requests and capacity move. The rate for Sherman is the 8.0 cents per kWh state industrial average (EIA-861), the same figure the map colours by. Across Sherman, reported per-utility industrial rates cover 3 of 5 serving utilities: 7.6 to 10.8¢/kWh, offered only as context beneath the state figure.
No interconnection-queue project is on record for Sherman, Kansas in the covered feeds, which reflects either genuine quiet or a queue not yet ingested. Sherman, Kansas has no EIA-860M generation on file, which reads as zero rather than as a gap. The balancing authority covering Sherman carries a grid carbon intensity of 871.526 lb CO2 per MWh in eGRID.
Reported freshwater withdrawals for all uses in Sherman are 104.87 million gallons per day in the USGS 2015 compilation, existing demand rather than water free for a new load. Around Sherman, some 856 people work in construction within about a 120 km commute (BLS QCEW), a measure of reach, not of available crews.
These numbers for Sherman are screening-grade context for the whole county, drawn from public data with the gaps left visible. Read the figures for Sherman, Kansas together rather than one at a time: grid access matters less without substations near it, and a quiet queue reads differently inside an organized market than outside one. The next step for Sherman, Kansas is an address-level interconnection study; the county figures here only narrow where to look. For Sherman, Kansas, the source log below records where each figure comes from and when it was pulled, keeping the provenance visible.