Sheridan, KS: data center power outlook
The grid around Sheridan, Kansas is summarized here from public data, starting from the county's position in the SPP market (Southwest Power Pool). Inside Sheridan the mapped layer shows 3 mapped substations, with grid access reaching 115 kV at its strongest point. Retail service across Sheridan is split among 4 utilities, among them LANE-SCOTT ELECTRIC COOP, INC, MIDWEST ENERGY INC, PRAIRIE LAND ELECTRIC COOP INC.
Grid position at a glance
- Serving utilities
- LANE-SCOTT ELECTRIC COOP, INC, MIDWEST ENERGY INC, PRAIRIE LAND ELECTRIC COOP INC, WESTERN COOP ELECTRIC ASSN INC
- ISO / market
- SPP (Southwest Power Pool)
- Highest grid access
- 115 kV
- Substations in county
- 3
- Industrial retail rate
- 8.0¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
- Per-utility rates in county
- 3 of 4 serving utilities: 7.6 to 13.3¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
- Interconnection queue
- None on record
- Proposed generation
- None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
- Grid carbon intensity
- 872 lb CO2/MWh
- Water withdrawals
- 63 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
- Construction labor near site
- 1,602 employed in construction within ~120 km (14 of 19 counties reporting)A large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.
Grid conditions in Sheridan
Read on for the public power picture of Sheridan in Kansas, assembled for data center siting. Transmission-class access reaches 115 kV in Sheridan at its strongest mapped point. Sheridan, Kansas contains 3 mapped substations, a sparse footprint that concentrates interconnection options at a few points.
Wholesale activity over Sheridan clears through the SPP market (Southwest Power Pool), whose footprint sets how interconnection requests and capacity are handled. Sheridan carries the state industrial average retail rate of 8.0 cents per kWh from EIA-861, applied statewide. For Sheridan, the per-utility spread is 3 of 4 serving utilities: 7.6 to 13.3¢/kWh, which qualifies but never replaces the state average.
For Sheridan, Kansas, no queued project appears in the feeds currently covered. No generation is filed as planned or under construction in Sheridan, Kansas in the federal EIA-860M inventory, a measured zero rather than missing data. In eGRID, the balancing authority over Sheridan shows 871.526 lb CO2 per MWh.
For Sheridan, the USGS 2015 compilation records 63.44 million gallons per day of all-use freshwater withdrawals, not water available to a new load. Sheridan sits within commuting range of roughly 1,602 construction workers (BLS QCEW, about 120 km), most already committed elsewhere.
Every figure for Sheridan here is screening-grade and describes the county as a whole, not any single parcel within it. None of the figures for Sheridan, Kansas settles a site on its own; each one qualifies the others, and all of them come from public federal and state datasets. Settling a site in Sheridan, Kansas requires a study of the specific parcel, a step beyond the county-level picture drawn here. Sources and data dates for Sheridan, Kansas are logged directly below, so each figure on this page can be traced back to its public dataset.