For Meade, Kansas, the public grid picture begins with its place in the SPP market (Southwest Power Pool) and the infrastructure mapped inside the county. Grid access across Meade tops out at 115 kV, over a footprint of 9 mapped substations. In Meade, 8 utilities share the retail territory, among them CITY OF MEADE - (KS), CMS ELECTRIC COOP INC, NORTHWESTERN ELECTRIC COOP INC - (OK).
Grid position at a glance
- Serving utilities
- CITY OF MEADE - (KS), CMS ELECTRIC COOP INC, NORTHWESTERN ELECTRIC COOP INC - (OK), PIONEER ELECTRIC COOP, INC - (KS), SOUTHERN PIONEER ELECTRIC COMPANY, TRI-COUNTY ELECTRIC COOP, INC (OK), VICTORY ELECTRIC COOP ASSN INC, WHEATLAND ELECTRIC COOP, INC
- ISO / market
- SPP (Southwest Power Pool)
- Highest grid access
- 115 kV
- Substations in county
- 9
- Industrial retail rate
- 8.0¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
- Per-utility rates in county
- 6 of 8 serving utilities: 5.7 to 17.8¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
- Interconnection queue
- None on record
- Proposed generation
- None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
- Grid carbon intensity
- 872 lb CO2/MWh
- Water withdrawals
- 131 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
- Construction labor near site
- 2,600 employed in construction within ~120 km (10 of 18 counties reporting)A large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.
Grid conditions in Meade
This page gathers the public grid evidence for Meade, Kansas that bears on a large new load. The strongest mapped access in Meade is 115 kV, squarely transmission class. Meade carries 9 substations in the mapped layer, spread across the county.
For Meade, the SPP market (Southwest Power Pool) is the operator that handles interconnection and capacity. The state industrial average retail rate is 8.0 cents per kWh, drawn from EIA-861 and applied to Meade at the state level rather than as a county rate. The serving utilities in Meade that publish a rate range 6 of 8 serving utilities: 5.7 to 17.8¢/kWh, a spread kept separate from the state average.
Meade, Kansas shows no interconnection-queue project in the covered feeds, whether from real quiet or a feed not yet loaded. For Meade, Kansas, the EIA-860M inventory shows no planned or under-construction generation, a measured absence. Grid carbon intensity for Meade, via its balancing authority, is 871.526 lb CO2 per MWh in eGRID.
USGS 2015 puts freshwater withdrawals across Meade at 130.77 million gallons per day for all uses, a measure of use, not spare supply. Within roughly a 120 km commute of Meade, about 2,600 people are employed in construction (BLS QCEW), which speaks to how far crews for a multi-year build would travel, not to labour known to be free.
Read the Meade figures as screening-grade context: they describe the surrounding grid, not a specific parcel. The numbers for Meade, Kansas qualify one another, so grid access, substation density, market membership, and rate are meant to be read as a set, not in isolation. Past this screening view, siting in Meade, Kansas turns on a study of a particular address, something no county-level page can stand in for. Every number shown for Meade, Kansas traces to a public source listed below, with its retrieval date, so the provenance is auditable rather than asserted.