Power by county

Clay, KS: data center power outlook

The grid around Clay, Kansas is summarized here from public data, starting from the county's position in the SPP market (Southwest Power Pool). Inside Clay the mapped layer shows 4 mapped substations, with grid access reaching 230 kV at its strongest point. Retail service across Clay is split among 7 utilities, among them BLUESTEM ELECTRIC COOP INC, CITY OF CLAY CENTER - (KS), DS&O ELECTRIC COOPERATIVE, INC..

Grid position at a glance

Serving utilities
BLUESTEM ELECTRIC COOP INC, CITY OF CLAY CENTER - (KS), DS&O ELECTRIC COOPERATIVE, INC., EVERGY KANSAS CENTRAL, INC, FLINT HILLS RURAL E C A, INC, PRAIRIE LAND ELECTRIC COOP INC, ROLLING HILLS ELECTRIC COOP
ISO / market
SPP (Southwest Power Pool)
Highest grid access
230 kV
Substations in county
4
Industrial retail rate
8.0¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
Per-utility rates in county
2 of 7 serving utilities: 7.6 to 9.1¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
Interconnection queue
None on record
Proposed generation
None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
Grid carbon intensity
872 lb CO2/MWh
Water withdrawals
12 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
Construction labor near site
7,742 employed in construction within ~120 km (24 of 26 counties reporting)A large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.

Grid conditions in Clay

The sections below set out what public data shows about siting a large electrical load in Clay, Kansas. Transmission-class access reaches 230 kV in Clay at its strongest mapped point. Clay, Kansas shows 4 substations in the mapped layer, a thin spread across the county.

Wholesale activity over Clay clears through the SPP market (Southwest Power Pool), whose footprint sets how interconnection requests and capacity are handled. Clay carries the state industrial average retail rate of 8.0 cents per kWh from EIA-861, applied statewide. For Clay, the per-utility spread is 2 of 7 serving utilities: 7.6 to 9.1¢/kWh, which qualifies but never replaces the state average.

Clay, Kansas has nothing in the interconnection queue across the feeds covered here, quiet or uningested. For Clay, Kansas, the EIA-860M inventory shows no planned or under-construction generation, a measured absence. In eGRID, the balancing authority over Clay shows 871.526 lb CO2 per MWh.

For Clay, the USGS 2015 compilation records 11.96 million gallons per day of all-use freshwater withdrawals, not water available to a new load. Clay sits within commuting range of roughly 7,742 construction workers (BLS QCEW, about 120 km), most already committed elsewhere.

Every figure for Clay here is screening-grade and describes the county as a whole, not any single parcel within it. None of the figures for Clay, Kansas settles a site on its own; each one qualifies the others, and all of them come from public federal and state datasets. Settling a site in Clay, Kansas requires a study of the specific parcel, a step beyond the county-level picture drawn here. Sources and data dates for Clay, Kansas are logged directly below, so each figure on this page can be traced back to its public dataset.

Sources