Cheyenne, KS: data center power outlook
The grid around Cheyenne, Kansas is summarized here from public data, starting from the county's position in the SPP market (Southwest Power Pool). Inside Cheyenne the mapped layer shows 8 mapped substations, with grid access reaching 115 kV at its strongest point. Retail service across Cheyenne is split among 7 utilities, among them CITY OF ST FRANCIS - (KS), HIGHLINE ELECTRIC ASSN, MIDWEST ENERGY INC.
Grid position at a glance
- Serving utilities
- CITY OF ST FRANCIS - (KS), HIGHLINE ELECTRIC ASSN, MIDWEST ENERGY INC, PRAIRIE LAND ELECTRIC COOP INC, SOUTHWEST PUBLIC POWER DIST, WAPA-- WESTERN AREA POWER ADMINISTRATION, Y-W ELECTRIC ASSN INC
- ISO / market
- SPP (Southwest Power Pool)
- Highest grid access
- 115 kV
- Substations in county
- 8
- Industrial retail rate
- 8.0¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
- Per-utility rates in county
- 2 of 7 serving utilities: 7.6 to 7.8¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
- Interconnection queue
- None on record
- Proposed generation
- None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
- Grid carbon intensity
- 872 lb CO2/MWh
- Water withdrawals
- 51 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
- Construction labor near site
- 1,053 employed in construction within ~120 km (12 of 16 counties reporting)A large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.
Grid conditions in Cheyenne
Read on for the public power picture of Cheyenne in Kansas, assembled for data center siting. Transmission-class access reaches 115 kV in Cheyenne at its strongest mapped point. Cheyenne contains 8 mapped substations, a moderate footprint spread across the service area.
Wholesale activity over Cheyenne clears through the SPP market (Southwest Power Pool), whose footprint sets how interconnection requests and capacity are handled. Cheyenne carries the state industrial average retail rate of 8.0 cents per kWh from EIA-861, applied statewide. For Cheyenne, the per-utility spread is 2 of 7 serving utilities: 7.6 to 7.8¢/kWh, which qualifies but never replaces the state average.
Cheyenne, Kansas shows no interconnection-queue project in the covered feeds, whether from real quiet or a feed not yet loaded. The federal EIA-860M inventory files no planned or under-construction generation in Cheyenne, Kansas, a real zero rather than a gap. In eGRID, the balancing authority over Cheyenne shows 871.526 lb CO2 per MWh.
For Cheyenne, the USGS 2015 compilation records 50.58 million gallons per day of all-use freshwater withdrawals, not water available to a new load. Cheyenne sits within commuting range of roughly 1,053 construction workers (BLS QCEW, about 120 km), most already committed elsewhere.
Every figure for Cheyenne here is screening-grade and describes the county as a whole, not any single parcel within it. None of the figures for Cheyenne, Kansas settles a site on its own; each one qualifies the others, and all of them come from public federal and state datasets. Settling a site in Cheyenne, Kansas requires a study of the specific parcel, a step beyond the county-level picture drawn here. Sources and data dates for Cheyenne, Kansas are logged directly below, so each figure on this page can be traced back to its public dataset.