Power by county

Greene, IA: data center power outlook

Greene, Iowa is served through the MISO market (Midcontinent Independent System Operator), and the figures below describe the public grid around a prospective data center site there. Greene carries 9 mapped substations within its boundary, and the highest reachable grid access is 161 kV. Service in Greene spans 8 utilities, with CALHOUN COUNTY ELEC COOP ASSN, CITY OF GRAND JUNCTION - (IA), CITY OF PATON - (IA) among those mapped.

Grid position at a glance

Serving utilities
CALHOUN COUNTY ELEC COOP ASSN, CITY OF GRAND JUNCTION - (IA), CITY OF PATON - (IA), GUTHRIE COUNTY RURAL E C A, INTERSTATE POWER AND LIGHT CO, MIDAMERICAN ENERGY CO, MIDLAND POWER COOP, RACCOON VALLEY ELECTRIC COOPERATIVE
ISO / market
MISO (Midcontinent Independent System Operator)
Highest grid access
161 kV
Substations in county
9
Industrial retail rate
7.2¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
Per-utility rates in county
3 of 8 serving utilities: 6.0 to 8.2¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
Interconnection queue
3 projects, 281 MW
Proposed generation
None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
Grid carbon intensity
982 lb CO2/MWh
Water withdrawals
3.3 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
Construction labor near site
36,011 employed in construction within ~120 km (28 of 29 counties reporting)A large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.

Grid conditions in Greene

The material below frames Greene, Iowa for a prospective large load, drawing only on public sources. At 161 kV, Greene sits in the transmission class that a large load would look to. The mapped layer places 9 substations across Greene, a moderate density.

Interconnection over Greene runs through the MISO market (Midcontinent Independent System Operator) and its rules. For Greene, the rate shown is the state industrial average of 7.2 cents per kWh (EIA-861), a state figure and not a county-specific one. Beneath that state average, the utilities serving Greene that report an industrial rate span 3 of 8 serving utilities: 6.0 to 8.2¢/kWh, shown as context and never as the county rate.

The queue feeds show 3 projects for Greene, totalling 281 MW of requested capacity. Nothing is on file for Greene, Iowa in EIA-860M as planned or under construction, which counts as a measured zero. Greene sits under a balancing authority that eGRID puts at 981.982 lb CO2 per MWh.

Greene withdrew 3.32 million gallons per day for all uses in the USGS 2015 data, which counts demand, not headroom. About 36,011 people are employed in construction within a 120 km commute of Greene (BLS QCEW), which frames staffing distance rather than free labour.

For Greene, treat this as screening-grade county context useful for narrowing a search rather than settling a site. Taken together, the figures for Greene, Iowa describe the grid around a prospective site, drawn from public data with their gaps left visible on purpose. To move past screening in Greene, Iowa, a specific address needs its own interconnection study, which this page does not attempt. The figures for Greene, Iowa refresh as their public datasets do, and the exact sources and dates sit in the source log below this section.

Sources