Power by county
Emmet, IA: data center power outlook
The grid around Emmet, Iowa is summarized here from public data, starting from the county's position in the SPP market (Southwest Power Pool). Inside Emmet the mapped layer shows 9 mapped substations, with grid access reaching 69 kV at its strongest point. Retail service across Emmet is split among 6 utilities, among them CITY OF DUNNELL - (MN), CITY OF ESTHERVILLE - (IA), FEDERATED RURAL ELECTRIC ASSN.
Grid position at a glance
- Serving utilities
- CITY OF DUNNELL - (MN), CITY OF ESTHERVILLE - (IA), FEDERATED RURAL ELECTRIC ASSN, INTERSTATE POWER AND LIGHT CO, IOWA LAKES ELECTRIC COOP, MIDAMERICAN ENERGY CO
- ISO / market
- SPP (Southwest Power Pool)
- Highest grid access
- 69 kV
- Substations in county
- 9
- Industrial retail rate
- 7.2¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
- Per-utility rates in county
- 4 of 6 serving utilities: 6.0 to 15.3¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
- Interconnection queue
- None on record
- Proposed generation
- None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
- Grid carbon intensity
- 982 lb CO2/MWh
- Water withdrawals
- 2.8 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
- Construction labor near site
- 11,326 employed in construction within ~120 kmA large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.
Grid conditions in Emmet
The sections below set out what public data shows about siting a large electrical load in Emmet, Iowa. Grid access in Emmet peaks at 69 kV, below the transmission class most large loads look for. Emmet contains 9 mapped substations, a moderate footprint spread across the service area.
Wholesale activity over Emmet clears through the SPP market (Southwest Power Pool), whose footprint sets how interconnection requests and capacity are handled. Emmet carries the state industrial average retail rate of 7.2 cents per kWh from EIA-861, applied statewide. For Emmet, the per-utility spread is 4 of 6 serving utilities: 6.0 to 15.3¢/kWh, which qualifies but never replaces the state average.
For Emmet, Iowa, no queued project appears in the feeds currently covered. The federal EIA-860M inventory files no planned or under-construction generation in Emmet, Iowa, a real zero rather than a gap. In eGRID, the balancing authority over Emmet shows 981.982 lb CO2 per MWh.
For Emmet, the USGS 2015 compilation records 2.8 million gallons per day of all-use freshwater withdrawals, not water available to a new load. Emmet sits within commuting range of roughly 11,326 construction workers (BLS QCEW, about 120 km), most already committed elsewhere.
Every figure for Emmet here is screening-grade and describes the county as a whole, not any single parcel within it. None of the figures for Emmet, Iowa settles a site on its own; each one qualifies the others, and all of them come from public federal and state datasets. Settling a site in Emmet, Iowa requires a study of the specific parcel, a step beyond the county-level picture drawn here. Sources and data dates for Emmet, Iowa are logged directly below, so each figure on this page can be traced back to its public dataset.