The grid around Wabash, Indiana is summarized here from public data, starting from the county's position in the PJM market (PJM Interconnection). Inside Wabash the mapped layer shows 13 mapped substations, with grid access reaching 138 kV at its strongest point. Retail service across Wabash is split among 8 utilities, among them DUKE ENERGY INDIANA, LLC, FULTON COUNTY RURAL E M C, HEARTLAND REMC.

Grid position at a glance

Serving utilities
DUKE ENERGY INDIANA, LLC, FULTON COUNTY RURAL E M C, HEARTLAND REMC, INDIANA MICHIGAN POWER CO, KOSCIUSKO COUNTY RURAL E M C, MIAMI-CASS COUNTY RURAL E M C, NOBLE COUNTY R E M C, NORTHEASTERN RURAL E M C
ISO / market
PJM (PJM Interconnection)
Highest grid access
138 kV
Substations in county
13
Industrial retail rate
8.9¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
Per-utility rates in county
6 of 8 serving utilities: 4.6 to 10.8¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
Interconnection queue
3 projects, 450 MW
Proposed generation
None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
Grid carbon intensity
982 lb CO2/MWh
Water withdrawals
7.6 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
Construction labor near site
66,906 employed in construction within ~120 kmA large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.

Grid conditions in Wabash

The sections below set out what public data shows about siting a large electrical load in Wabash, Indiana. Transmission-class access reaches 138 kV in Wabash at its strongest mapped point. Wabash contains 13 mapped substations, a moderate footprint spread across the service area.

Wholesale activity over Wabash clears through the PJM market (PJM Interconnection), whose footprint sets how interconnection requests and capacity are handled. Wabash carries the state industrial average retail rate of 8.9 cents per kWh from EIA-861, applied statewide. For Wabash, the per-utility spread is 6 of 8 serving utilities: 4.6 to 10.8¢/kWh, which qualifies but never replaces the state average.

Wabash carries 3 projects in the interconnection queue, totalling 450 MW of requested capacity. No generation is filed as planned or under construction in Wabash, Indiana in the federal EIA-860M inventory, a measured zero rather than missing data. In eGRID, the balancing authority over Wabash shows 981.982 lb CO2 per MWh.

For Wabash, the USGS 2015 compilation records 7.64 million gallons per day of all-use freshwater withdrawals, not water available to a new load. Wabash sits within commuting range of roughly 66,906 construction workers (BLS QCEW, about 120 km), most already committed elsewhere.

Every figure for Wabash here is screening-grade and describes the county as a whole, not any single parcel within it. None of the figures for Wabash, Indiana settles a site on its own; each one qualifies the others, and all of them come from public federal and state datasets. Settling a site in Wabash, Indiana requires a study of the specific parcel, a step beyond the county-level picture drawn here. Sources and data dates for Wabash, Indiana are logged directly below, so each figure on this page can be traced back to its public dataset.

Sources