Power by county
Lake, IN: data center power outlook
Lake, Indiana is served through the MISO market (Midcontinent Independent System Operator), and the figures below describe the public grid around a prospective data center site there. Lake carries 118 mapped substations within its boundary, and the highest reachable grid access is 765 kV. Service in Lake spans 4 utilities, with COMMONWEALTH EDISON CO, JASPER COUNTY RURAL E M C, KANKAKEE VALLEY RURAL E M C among those mapped.
Grid position at a glance
- Serving utilities
- COMMONWEALTH EDISON CO, JASPER COUNTY RURAL E M C, KANKAKEE VALLEY RURAL E M C, NORTHERN INDIANA PUB SERV CO
- ISO / market
- MISO (Midcontinent Independent System Operator)
- Highest grid access
- 765 kV
- Substations in county
- 118
- Industrial retail rate
- 8.9¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
- Per-utility rates in county
- 3 of 4 serving utilities: 6.3 to 11.1¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
- Interconnection queue
- 8 projects, 1,250 MW
- Proposed generation
- 100 MW planned or under constructionUnits filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
- Grid carbon intensity
- 982 lb CO2/MWh
- Water withdrawals
- 1,267 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
- Construction labor near site
- 190,039 employed in construction within ~120 kmA large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.
Grid conditions in Lake
The material below frames Lake, Indiana for a prospective large load, drawing only on public sources. Grid access in Lake extends to 765 kV, the extra-high-voltage class. The mapped layer packs 118 substations into Lake, a dense spread of options.
Interconnection over Lake runs through the MISO market (Midcontinent Independent System Operator) and its rules. For Lake, the rate shown is the state industrial average of 8.9 cents per kWh (EIA-861), a state figure and not a county-specific one. Beneath that state average, the utilities serving Lake that report an industrial rate span 3 of 4 serving utilities: 6.3 to 11.1¢/kWh, shown as context and never as the county rate.
The queue feeds show 8 projects for Lake, totalling 1,250 MW of requested capacity. EIA-860M records 100 MW planned or under construction for Lake. Lake sits under a balancing authority that eGRID puts at 981.982 lb CO2 per MWh.
Lake withdrew 1,266.77 million gallons per day for all uses in the USGS 2015 data, which counts demand, not headroom. About 190,039 people are employed in construction within a 120 km commute of Lake (BLS QCEW), which frames staffing distance rather than free labour.
For Lake, treat this as screening-grade county context useful for narrowing a search rather than settling a site. Taken together, the figures for Lake, Indiana describe the grid around a prospective site, drawn from public data with their gaps left visible on purpose. To move past screening in Lake, Indiana, a specific address needs its own interconnection study, which this page does not attempt. The figures for Lake, Indiana refresh as their public datasets do, and the exact sources and dates sit in the source log below this section.