Jennings, IN: data center power outlook
For Jennings, Indiana, the public grid picture begins with its place in the MISO market (Midcontinent Independent System Operator) and the infrastructure mapped inside the county. Grid access across Jennings tops out at 765 kV, over a footprint of 8 mapped substations. In Jennings, 5 utilities share the retail territory, among them BARTHOLOMEW COUNTY RURAL E M C, DECATUR COUNTY RURAL E M C, DUKE ENERGY INDIANA, LLC.
Grid position at a glance
- Serving utilities
- BARTHOLOMEW COUNTY RURAL E M C, DECATUR COUNTY RURAL E M C, DUKE ENERGY INDIANA, LLC, JACKSON COUNTY RURAL E M C - (IN), SOUTHEASTERN INDIANA R E M C
- ISO / market
- MISO (Midcontinent Independent System Operator)
- Highest grid access
- 765 kV
- Substations in county
- 8
- Industrial retail rate
- 8.9¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
- Per-utility rates in county
- 5 serving utilities: 7.9 to 10.5¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
- Interconnection queue
- 3 projects, 144 MW
- Proposed generation
- None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
- Grid carbon intensity
- 982 lb CO2/MWh
- Water withdrawals
- 2.4 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
- Construction labor near site
- 140,661 employed in construction within ~120 km (48 of 54 counties reporting)A large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.
Grid conditions in Jennings
This page gathers the public grid evidence for Jennings, Indiana that bears on a large new load. The highest mapped voltage in Jennings is 765 kV, an extra-high-voltage line. Jennings carries 8 substations in the mapped layer, spread across the county.
For Jennings, the MISO market (Midcontinent Independent System Operator) is the operator that handles interconnection and capacity. The state industrial average retail rate is 8.9 cents per kWh, drawn from EIA-861 and applied to Jennings at the state level rather than as a county rate. The serving utilities in Jennings that publish a rate range 5 serving utilities: 7.9 to 10.5¢/kWh, a spread kept separate from the state average.
On record for Jennings are 3 interconnection-queue projects, totalling 144 MW of requested capacity. The federal EIA-860M inventory files no planned or under-construction generation in Jennings, Indiana, a real zero rather than a gap. Grid carbon intensity for Jennings, via its balancing authority, is 981.982 lb CO2 per MWh in eGRID.
USGS 2015 puts freshwater withdrawals across Jennings at 2.44 million gallons per day for all uses, a measure of use, not spare supply. Within roughly a 120 km commute of Jennings, about 140,661 people are employed in construction (BLS QCEW), which speaks to how far crews for a multi-year build would travel, not to labour known to be free.
Read the Jennings figures as screening-grade context: they describe the surrounding grid, not a specific parcel. The numbers for Jennings, Indiana qualify one another, so grid access, substation density, market membership, and rate are meant to be read as a set, not in isolation. Past this screening view, siting in Jennings, Indiana turns on a study of a particular address, something no county-level page can stand in for. Every number shown for Jennings, Indiana traces to a public source listed below, with its retrieval date, so the provenance is auditable rather than asserted.