Power by county
Fountain, IN: data center power outlook
Fountain, Indiana is served through the MISO market (Midcontinent Independent System Operator), and the figures below describe the public grid around a prospective data center site there. Fountain carries 10 mapped substations within its boundary, and the highest reachable grid access is 345 kV. Service in Fountain spans 7 utilities, with CITY OF COVINGTON - (IN), DUKE ENERGY INDIANA, LLC, PARKE COUNTY RURAL E M C among those mapped.
Grid position at a glance
- Serving utilities
- CITY OF COVINGTON - (IN), DUKE ENERGY INDIANA, LLC, PARKE COUNTY RURAL E M C, TIPMONT RURAL ELEC MEMBER CORP, TOWN OF ROCKVILLE - (IN), TOWN OF VEEDERSBURG - (IN), WARREN COUNTY RURAL E M C
- ISO / market
- MISO (Midcontinent Independent System Operator)
- Highest grid access
- 345 kV
- Substations in county
- 10
- Industrial retail rate
- 8.9¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
- Per-utility rates in county
- 2 of 7 serving utilities: 7.9 to 8.7¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
- Interconnection queue
- 9 projects, 1,395 MW
- Proposed generation
- None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
- Grid carbon intensity
- 982 lb CO2/MWh
- Water withdrawals
- 3.7 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
- Construction labor near site
- 77,972 employed in construction within ~120 kmA large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.
Grid conditions in Fountain
The material below frames Fountain, Indiana for a prospective large load, drawing only on public sources. Grid access in Fountain extends to 345 kV, a high-voltage line class. The mapped layer places 10 substations across Fountain, a moderate density.
Interconnection over Fountain runs through the MISO market (Midcontinent Independent System Operator) and its rules. For Fountain, the rate shown is the state industrial average of 8.9 cents per kWh (EIA-861), a state figure and not a county-specific one. Beneath that state average, the utilities serving Fountain that report an industrial rate span 2 of 7 serving utilities: 7.9 to 8.7¢/kWh, shown as context and never as the county rate.
The queue feeds show 9 projects for Fountain, totalling 1,395 MW of requested capacity. Nothing is on file for Fountain, Indiana in EIA-860M as planned or under construction, which counts as a measured zero. Fountain sits under a balancing authority that eGRID puts at 981.982 lb CO2 per MWh.
Fountain withdrew 3.68 million gallons per day for all uses in the USGS 2015 data, which counts demand, not headroom. About 77,972 people are employed in construction within a 120 km commute of Fountain (BLS QCEW), which frames staffing distance rather than free labour.
For Fountain, treat this as screening-grade county context useful for narrowing a search rather than settling a site. Taken together, the figures for Fountain, Indiana describe the grid around a prospective site, drawn from public data with their gaps left visible on purpose. To move past screening in Fountain, Indiana, a specific address needs its own interconnection study, which this page does not attempt. The figures for Fountain, Indiana refresh as their public datasets do, and the exact sources and dates sit in the source log below this section.