Power by county

Carroll, IN: data center power outlook

The grid around Carroll, Indiana is summarized here from public data, starting from the county's position in the PJM market (PJM Interconnection). Inside Carroll the mapped layer shows 7 mapped substations, with grid access reaching 230 kV at its strongest point. Retail service across Carroll is split among 4 utilities, among them CARROLL-WHITE REMC, DUKE ENERGY INDIANA, LLC, MIAMI-CASS COUNTY RURAL E M C.

Grid position at a glance

Serving utilities
CARROLL-WHITE REMC, DUKE ENERGY INDIANA, LLC, MIAMI-CASS COUNTY RURAL E M C, NORTHERN INDIANA PUB SERV CO
ISO / market
PJM (PJM Interconnection)
Highest grid access
230 kV
Substations in county
7
Industrial retail rate
8.9¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
Per-utility rates in county
3 of 4 serving utilities: 6.3 to 8.6¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
Interconnection queue
2 projects, 359 MW
Proposed generation
None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
Grid carbon intensity
982 lb CO2/MWh
Water withdrawals
9.5 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
Construction labor near site
105,393 employed in construction within ~120 kmA large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.

Grid conditions in Carroll

The sections below set out what public data shows about siting a large electrical load in Carroll, Indiana. Transmission-class access reaches 230 kV in Carroll at its strongest mapped point. Carroll contains 7 mapped substations, a moderate footprint spread across the service area.

Wholesale activity over Carroll clears through the PJM market (PJM Interconnection), whose footprint sets how interconnection requests and capacity are handled. Carroll carries the state industrial average retail rate of 8.9 cents per kWh from EIA-861, applied statewide. For Carroll, the per-utility spread is 3 of 4 serving utilities: 6.3 to 8.6¢/kWh, which qualifies but never replaces the state average.

Carroll carries 2 projects in the interconnection queue, totalling 359 MW of requested capacity. For Carroll, Indiana, the EIA-860M inventory shows no planned or under-construction generation, a measured absence. In eGRID, the balancing authority over Carroll shows 981.982 lb CO2 per MWh.

For Carroll, the USGS 2015 compilation records 9.53 million gallons per day of all-use freshwater withdrawals, not water available to a new load. Carroll sits within commuting range of roughly 105,393 construction workers (BLS QCEW, about 120 km), most already committed elsewhere.

Every figure for Carroll here is screening-grade and describes the county as a whole, not any single parcel within it. None of the figures for Carroll, Indiana settles a site on its own; each one qualifies the others, and all of them come from public federal and state datasets. Settling a site in Carroll, Indiana requires a study of the specific parcel, a step beyond the county-level picture drawn here. Sources and data dates for Carroll, Indiana are logged directly below, so each figure on this page can be traced back to its public dataset.

Sources