Power by county

Massac, IL: data center power outlook

Massac, Illinois is served through the MISO market (Midcontinent Independent System Operator), and the figures below describe the public grid around a prospective data center site there. Massac carries 28 mapped substations within its boundary, and the highest reachable grid access is 345 kV. Service in Massac spans 6 utilities, with AMEREN ILLINOIS COMPANY, CITY OF METROPOLIS - (IL), JACKSON PURCHASE ENERGY CORPORATION among those mapped.

Grid position at a glance

Serving utilities
AMEREN ILLINOIS COMPANY, CITY OF METROPOLIS - (IL), JACKSON PURCHASE ENERGY CORPORATION, KENTUCKY UTILITIES CO, SOUTHEASTERN IL ELEC COOP, INC, SOUTHERN ILLINOIS ELEC COOP
ISO / market
MISO (Midcontinent Independent System Operator)
Highest grid access
345 kV
Substations in county
28
Industrial retail rate
10.1¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
Per-utility rates in county
2 of 6 serving utilities: 1.6 to 10.4¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
Interconnection queue
None on record
Proposed generation
2 MW planned or under constructionUnits filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
Grid carbon intensity
982 lb CO2/MWh
Water withdrawals
536 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
Construction labor near site
20,337 employed in construction within ~120 km (38 of 46 counties reporting)A large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.

Grid conditions in Massac

What follows is a screening-grade read of Massac, Illinois, built only from named public datasets. Grid access in Massac extends to 345 kV, a high-voltage line class. The mapped layer packs 28 substations into Massac, a dense spread of options.

Interconnection over Massac runs through the MISO market (Midcontinent Independent System Operator) and its rules. For Massac, the rate shown is the state industrial average of 10.1 cents per kWh (EIA-861), a state figure and not a county-specific one. Beneath that state average, the utilities serving Massac that report an industrial rate span 2 of 6 serving utilities: 1.6 to 10.4¢/kWh, shown as context and never as the county rate.

The covered queue feeds list nothing for Massac, Illinois, which may be quiet or simply uningested. EIA-860M records 2 MW planned or under construction for Massac. Massac sits under a balancing authority that eGRID puts at 981.982 lb CO2 per MWh.

Massac withdrew 535.74 million gallons per day for all uses in the USGS 2015 data, which counts demand, not headroom. About 20,337 people are employed in construction within a 120 km commute of Massac (BLS QCEW), which frames staffing distance rather than free labour.

For Massac, treat this as screening-grade county context useful for narrowing a search rather than settling a site. Taken together, the figures for Massac, Illinois describe the grid around a prospective site, drawn from public data with their gaps left visible on purpose. To move past screening in Massac, Illinois, a specific address needs its own interconnection study, which this page does not attempt. The figures for Massac, Illinois refresh as their public datasets do, and the exact sources and dates sit in the source log below this section.