Kankakee, IL: data center power outlook

Kankakee sits in the PJM market (PJM Interconnection); what follows is the screening-grade grid picture for Kankakee, Illinois, drawn from public datasets. Counting from the mapped infrastructure, Kankakee holds 11 mapped substations and reaches 345 kV. Kankakee is covered by 5 retail service territories, including AMEREN ILLINOIS COMPANY, COMMONWEALTH EDISON CO, EASTERN ILLINOIS ELEC COOP.

Grid position at a glance

Serving utilities
AMEREN ILLINOIS COMPANY, COMMONWEALTH EDISON CO, EASTERN ILLINOIS ELEC COOP, NEWTON COUNTY RURAL E M C, NORTHERN INDIANA PUB SERV CO
ISO / market
PJM (PJM Interconnection)
Highest grid access
345 kV
Substations in county
11
Industrial retail rate
10.1¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
Per-utility rates in county
3 of 5 serving utilities: 1.6 to 12.8¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
Interconnection queue
None on record
Proposed generation
937 MW planned or under constructionUnits filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
Grid carbon intensity
716 lb CO2/MWh
Water withdrawals
23 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
Construction labor near site
181,803 employed in construction within ~120 kmA large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.

Grid conditions in Kankakee

Everything here about Kankakee, Illinois comes from public federal and state records, with the gaps left visible. Kankakee reaches 345 kV, a high-voltage transmission class, at its strongest mapped point of grid access. With 11 substations mapped, Kankakee has a moderate spread of interconnection points.

Kankakee falls inside the PJM market (PJM Interconnection), which governs how its interconnection requests and capacity move. The rate for Kankakee is the 10.1 cents per kWh state industrial average (EIA-861), the same figure the map colours by. Across Kankakee, reported per-utility industrial rates cover 3 of 5 serving utilities: 1.6 to 12.8¢/kWh, offered only as context beneath the state figure.

The covered queue feeds list nothing for Kankakee, Illinois, which may be quiet or simply uningested. Kankakee has 936.5 MW of planned or under-construction generation on file in EIA-860M. The balancing authority covering Kankakee carries a grid carbon intensity of 716.09 lb CO2 per MWh in eGRID.

Reported freshwater withdrawals for all uses in Kankakee are 23.16 million gallons per day in the USGS 2015 compilation, existing demand rather than water free for a new load. Around Kankakee, some 181,803 people work in construction within about a 120 km commute (BLS QCEW), a measure of reach, not of available crews.

These numbers for Kankakee are screening-grade context for the whole county, drawn from public data with the gaps left visible. Read the figures for Kankakee, Illinois together rather than one at a time: grid access matters less without substations near it, and a quiet queue reads differently inside an organized market than outside one. The next step for Kankakee, Illinois is an address-level interconnection study; the county figures here only narrow where to look. For Kankakee, Illinois, the source log below records where each figure comes from and when it was pulled, keeping the provenance visible.