Iroquois, Illinois is served through the MISO market (Midcontinent Independent System Operator), and the figures below describe the public grid around a prospective data center site there. Iroquois carries 9 mapped substations within its boundary, and the highest reachable grid access is 138 kV. Service in Iroquois spans 6 utilities, with AMEREN ILLINOIS COMPANY, COMMONWEALTH EDISON CO, EASTERN ILLINOIS ELEC COOP among those mapped.
Grid position at a glance
- Serving utilities
- AMEREN ILLINOIS COMPANY, COMMONWEALTH EDISON CO, EASTERN ILLINOIS ELEC COOP, NEWTON COUNTY RURAL E M C, NORTHERN INDIANA PUB SERV CO, WARREN COUNTY RURAL E M C
- ISO / market
- MISO (Midcontinent Independent System Operator)
- Highest grid access
- 138 kV
- Substations in county
- 9
- Industrial retail rate
- 10.1¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
- Per-utility rates in county
- 3 of 6 serving utilities: 1.6 to 12.8¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
- Interconnection queue
- 9 projects, 1,978 MW
- Proposed generation
- 5 MW planned or under constructionUnits filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
- Grid carbon intensity
- 982 lb CO2/MWh
- Water withdrawals
- 4.2 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
- Construction labor near site
- 137,852 employed in construction within ~120 kmA large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.
Grid conditions in Iroquois
What follows is a screening-grade read of Iroquois, Illinois, built only from named public datasets. At 138 kV, Iroquois sits in the transmission class that a large load would look to. The mapped layer places 9 substations across Iroquois, a moderate density.
Interconnection over Iroquois runs through the MISO market (Midcontinent Independent System Operator) and its rules. For Iroquois, the rate shown is the state industrial average of 10.1 cents per kWh (EIA-861), a state figure and not a county-specific one. Beneath that state average, the utilities serving Iroquois that report an industrial rate span 3 of 6 serving utilities: 1.6 to 12.8¢/kWh, shown as context and never as the county rate.
The queue feeds show 9 projects for Iroquois, totalling 1,977.77 MW of requested capacity. EIA-860M records 4.5 MW planned or under construction for Iroquois. Iroquois sits under a balancing authority that eGRID puts at 981.982 lb CO2 per MWh.
Iroquois withdrew 4.21 million gallons per day for all uses in the USGS 2015 data, which counts demand, not headroom. About 137,852 people are employed in construction within a 120 km commute of Iroquois (BLS QCEW), which frames staffing distance rather than free labour.
For Iroquois, treat this as screening-grade county context useful for narrowing a search rather than settling a site. Taken together, the figures for Iroquois, Illinois describe the grid around a prospective site, drawn from public data with their gaps left visible on purpose. To move past screening in Iroquois, Illinois, a specific address needs its own interconnection study, which this page does not attempt. The figures for Iroquois, Illinois refresh as their public datasets do, and the exact sources and dates sit in the source log below this section.